My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-174/approving a professional engineering services agreement between the City and Freese and Nichols, Inc. for the provision of professional services in connection with the Main Lift Station Force Main Replacement and Reclaimed Water Improvements
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-174/approving a professional engineering services agreement between the City and Freese and Nichols, Inc. for the provision of professional services in connection with the Main Lift Station Force Main Replacement and Reclaimed Water Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 8:51:15 AM
Creation date
12/22/2015 10:14:30 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-174
Date
12/15/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a. Pre - Construction Meeting: Assist the City in conducting pre - construction conference with the <br />Contractor. Prepare project meeting notes. (1 total) <br />b. Construction Site Visits /Construction Progress Meetings: Make up to ten (10) site visits (not <br />including punchlist meeting and final completion site visit) during the course of construction <br />to observe the progress and the quality of work and to determine in general if the work is <br />proceeding in accordance with the Contract Documents. If Freese and Nichols is requested to <br />visit the site more frequently, the requested visits shall be considered an Additional Service <br />and Freese and Nichols shall be entitled to additional compensation. FNI will attend monthly <br />progress meetings, however, meeting agendas and notes will be prepared by others. <br />c. Punchlist Meeting: Conduct, in company with City's representative, a final review of the Project <br />for conformance with the design concept of the Project and general compliance with the <br />Construction Contract Documents. Prepare a list of deficiencies to be corrected by the <br />contractor before recommendation of final payment. (1 total) <br />d. Final Completion Site Visit: FNI will make one visit to the site to verify that punchlist items have <br />been addressed. FNI will document any items not completed. (1 total) <br />2. Construction Phase Services: <br />a. Establish and maintain a project documentation system consistent with the requirements of <br />the construction Contract Documents. <br />b. Monitor the processing of contractor's submittals and provide for filing and retrieval of project <br />documentation. <br />c. Produce monthly reports indicating the status of all submittals in the review process. <br />d. Review contractor's submittals, including: <br />1) Requests for information <br />2) Modification requests <br />3) Shop drawings <br />4) Schedules <br />5) Certified test reports <br />6) Othersubmittals <br />7) Excessive submittal review shall be considered reviewing any submittal more than twice and <br />shall be considered an additional service, unless it is caused in some part by FNI. <br />e. Monitor the progress of the Contractor in sending and processing submittals to see that <br />documentation is being processed in accordance with schedules. <br />f. Notify City of Contractor's non - conforming work observed on site visits. Review quality related <br />documents provided by the contractor such as test reports, equipment installation reports or <br />other documentation required by the Construction Contract Documents. <br />g. Interpret the drawings and specifications for City and Contractor. Investigations, analyses, and <br />studies requested by the Contractor and approved by City, for substitutions of equipment and /or <br />materials or deviations from the drawings and specifications is an additional service. <br />h. The Contractor will be responsible for construction materials testing as part of the construction <br />contract. The Contractor will coordinate the work of testing laboratories, witnessed tests, factory <br />testing, etc. for quality control of the Project. The coordination and cost of such quality control <br />Page 8 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.