My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2015-174/approving a professional engineering services agreement between the City and Freese and Nichols, Inc. for the provision of professional services in connection with the Main Lift Station Force Main Replacement and Reclaimed Water Improvements
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2015
>
Res 2015-174/approving a professional engineering services agreement between the City and Freese and Nichols, Inc. for the provision of professional services in connection with the Main Lift Station Force Main Replacement and Reclaimed Water Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 8:51:15 AM
Creation date
12/22/2015 10:14:30 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2015-174
Date
12/15/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(footprint and top), dams (tops and toes), edges of impounded water, floors of lakes and ponds (by <br />sounding or rodding), and vaults (top, edges and flow line). Indicate the material and type of each <br />item tied in. <br />4. Research utilities and easements within the project boundaries. Obtain drawings of existing agency <br />and municipal owned utilities and include locations of these utilities in the survey. Provide copies <br />of all existing utility plans to the Engineer in PDF format as they are received. <br />5. Coordinate utility marking with Dig Tess (level B), conduct survey and locate utilities within the <br />project boundary. Obtain the services of a utility locator service (such as DIGTESS) and coordinate <br />flagging of existing franchise utilities. Tie in the locations of the existing utilities on the survey. <br />Surveyor shall bear all costs for the services of such a locator. The City will provide support for <br />locating existing utilities within the existing lift station and WWTP sites. <br />6. Surveyor shall provide vertical location (Locating Quality Level A) of existing utilities for up to three <br />(3) potholed locations of utilities by means of non - destructive vacuum excavation methods. SUE <br />accordance with ASCE Publication CE /ASCE 38 -02 (Standard Guide for the Collection and Depiction <br />of Existing Subsurface Utility Data) Surveyor shall coordinate with the Engineer and the City for SUE <br />locations. <br />7. Provide control staking for the project. <br />8. Provide sufficient ground shots to create five (5) foot contours for the project. <br />9. Where necessary along route, the surveyor shall contact private property owner and attempt to <br />ascertain permission to enter and survey within private properties. If surveyor encounters a <br />hostile property owner, surveyor will consult with FNI and /or the City for directions for <br />resolution. <br />ADDITIONAL SERVICES: Additional Services to be performed by FNI, if authorized by the City, which <br />are not included in the above described basic services, are described as follows: <br />A. SCADA or radio communication system associated with the bulk refilling station. <br />B. Separation of project into multiple design, bid and /or construction packages. <br />C. Obtaining the services of a SCADA integration subconsultant. <br />D. Replacement or expansion of reclaimed water pumps. <br />E. Design services for expansion of Main Lift Station. <br />F. Updates to the City of San Marcos Wastewater Master Plan. <br />G. Bid Phase services for procurement by any means other than low -bid, such as Competitive Sealed <br />Proposal. <br />H. Investigations involving consideration of operation, maintenance and overhead expenses, and the <br />preparation of rate schedules, earnings and expense statements, feasibility studies, appraisals, <br />evaluations, assessment schedules, and material audits or inventories required for certification offorce <br />account construction performed by the City. <br />I. Preparing applications and supporting documents for government grants, loans, or planning <br />advances and providing data for detailed applications. <br />Page 10 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.