Laserfiche WebLink
(footprint and top), dams (tops and toes), edges of impounded water, floors of lakes and ponds (by <br />sounding or rodding), and vaults (top, edges and flow line). Indicate the material and type of each <br />item tied in. <br />4. Research utilities and easements within the project boundaries. Obtain drawings of existing agency <br />and municipal owned utilities and include locations of these utilities in the survey. Provide copies <br />of all existing utility plans to the Engineer in PDF format as they are received. <br />5. Coordinate utility marking with Dig Tess (level B), conduct survey and locate utilities within the <br />project boundary. Obtain the services of a utility locator service (such as DIGTESS) and coordinate <br />flagging of existing franchise utilities. Tie in the locations of the existing utilities on the survey. <br />Surveyor shall bear all costs for the services of such a locator. The City will provide support for <br />locating existing utilities within the existing lift station and WWTP sites. <br />6. Surveyor shall provide vertical location (Locating Quality Level A) of existing utilities for up to three <br />(3) potholed locations of utilities by means of non - destructive vacuum excavation methods. SUE <br />accordance with ASCE Publication CE /ASCE 38 -02 (Standard Guide for the Collection and Depiction <br />of Existing Subsurface Utility Data) Surveyor shall coordinate with the Engineer and the City for SUE <br />locations. <br />7. Provide control staking for the project. <br />8. Provide sufficient ground shots to create five (5) foot contours for the project. <br />9. Where necessary along route, the surveyor shall contact private property owner and attempt to <br />ascertain permission to enter and survey within private properties. If surveyor encounters a <br />hostile property owner, surveyor will consult with FNI and /or the City for directions for <br />resolution. <br />ADDITIONAL SERVICES: Additional Services to be performed by FNI, if authorized by the City, which <br />are not included in the above described basic services, are described as follows: <br />A. SCADA or radio communication system associated with the bulk refilling station. <br />B. Separation of project into multiple design, bid and /or construction packages. <br />C. Obtaining the services of a SCADA integration subconsultant. <br />D. Replacement or expansion of reclaimed water pumps. <br />E. Design services for expansion of Main Lift Station. <br />F. Updates to the City of San Marcos Wastewater Master Plan. <br />G. Bid Phase services for procurement by any means other than low -bid, such as Competitive Sealed <br />Proposal. <br />H. Investigations involving consideration of operation, maintenance and overhead expenses, and the <br />preparation of rate schedules, earnings and expense statements, feasibility studies, appraisals, <br />evaluations, assessment schedules, and material audits or inventories required for certification offorce <br />account construction performed by the City. <br />I. Preparing applications and supporting documents for government grants, loans, or planning <br />advances and providing data for detailed applications. <br />Page 10 of 13 <br />