STATEMENT OF WORK (SOW) FOR CONSTRUCTION SERVICES <br />Project Name: San Marcos Five Mile Dam Park Solar — Contract No. <br />3.4.1. Mounting Hardware — LCRA shall utilize specialized aluminum and set screw block clamps to <br />mount PV array to roof structure. These clamps are designed to be non - penetrating, and will not <br />void the roofing manufacturer's warranty. <br />3.4.2. Racking System Rails — with the clamps in place, the extruded aluminum racking system rails will be <br />bolted directly to the block clamps. <br />3.4.3. PV Module Installation — with the racking system installed, each module is wired, clamped and <br />bolted in place. <br />3.4.4. Balance of System (BOS) Installation <br />3.4.4.1. Conduits and junction boxes on the roof shall be attached using the same clamps used for the <br />racking system rails. <br />3.4.4.2. Conduit shall be routed from the PV array, off the roof and down the exterior of the west wall <br />to a wall mounted PV DC disconnect switch. This switch will be located adjacent to the <br />building's main service disconnect. <br />3.4.4.3. A hole will be created to allow conduit to pass through the west wall into the building <br />electrical utility room. <br />3.4.4.4. In the electrical utility room, an additional DC disconnect shall be installed along with the <br />system inverter and AC disconnect. <br />3.4.4.5. The inverter output shall interface with the grid at the building main electrical service panel via <br />a dedicated subpanel, also located in electrical utility room. <br />3.4.5. Commissioning <br />3.4.5.1. System shall be commissioned upon completion of installation. Commissioning includes <br />insulation resistance tests, wiring continuity checks, operational electrical parameter <br />measurements, and monitoring system setup. <br />3.4.6. Inspection <br />3.4.6.1. A third -party inspection firm shall inspect and assess the system's completeness and <br />compliance with NEC 2011 requirements. <br />3.4.6.2. LCRA shall provide a copy of the final inspection report to San Marcos. <br />Page 4 of 4 <br />