My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-011/approving a professional services agreement with Lockwood, Andrews & Newnam, Inc. for the provision of engineering services in connection with the Coers Drive Improvements Project in the not-to-exceed amount of $149,875.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-011/approving a professional services agreement with Lockwood, Andrews & Newnam, Inc. for the provision of engineering services in connection with the Coers Drive Improvements Project in the not-to-exceed amount of $149,875.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 10:48:04 AM
Creation date
2/16/2016 11:42:54 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2016-11
Date
2/2/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
construction Plans and Technical Specifications. It is assumed a total of twelve (12) site visits will be <br />performed (average 2 per month). <br />7. Pay Estimate Review: LAN will review Contractor's Pay Applications after quantity concurrence by the <br />City's Construction Inspector. Review of six (6) Pay Applications has been assumed. <br />8. Review of Change Orders: LAN will review all Contractor requests for additional compensation and <br />assist the City in Change Order negotiation and preparation. It is assumed no more than one (1) change <br />order will be reviewed. <br />9. TDLR Inspection: Altura Solutions will inspect the completed sidewalks for project registration with <br />TDLR. <br />10. Substantial Completion: LAN will participate in one Substantial Completion walk- through to determine <br />outstanding items and document "punch list items ". LAN will issue a Certificate of Substantial Completion <br />when the contract requirements have been met. <br />V. Record Drawings Phase <br />1. Record Drawings: LAN will review the Contractor's provided redline as -built drawings and incorporate <br />changes made during construction as appropriate. LAN will deliver one (1) draft set of full size bond <br />drawings for inspector review, and one (1) pdf plan set for review. Upon City review and concurrence, <br />LAN will provide a final version of Record Drawings. <br />2. Deliverables: Upon City review of prepared draft record drawings, LAN will deliver Final Record <br />Drawings, consisting of two (2) sets of full size (22" x 34 ") bond drawings, one (1) pdf electronic copy, one <br />(1) set of GIS shape files for all new infrastructure, and one (1) CAD copy. <br />Supplemental Scope of Services <br />Design Phase (60 9/o/90 %/99 9/o/100% <br />1. Subsurface Utility Engineering: Cardno will perform subsurface utility engineering and locating services. <br />The scope of work shall include researching available existing utility records and performing in -field utility <br />designating (Quality Level B) and vacuum excavation test holes (Quality Level A) for up to four (4) test hole <br />locations, assumed to be within pavement areas. <br />City Responsibilities <br />1. The City will provide LAN all data in the City's possession relating to LAN's services on the Project. LAN <br />will reasonably rely upon the accuracy, timeliness, and completeness of the information provided by the <br />City. <br />2. The City will provide prompt notice to LAN whenever the City observes or becomes aware of any <br />development that affects the scope or schedule of LAN's services. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.