My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2009-079
San-Marcos
>
City Clerk
>
03 Resolutions
>
2000 s
>
2009
>
Res 2009-079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/3/2009 10:49:12 AM
Creation date
6/22/2009 9:19:10 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Grant Application
Number
2009-79
Date
6/16/2009
Volume Book
182
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENERGY M.ANAGEMEN r REPORT SEPTEMBER 2005 CITY OF SAN MARCOS <br />HVAC SYSTEM RETROFITS <br />Replace existing HVAC units with new high efficiency units at the facilities indicated in the <br />table below. The existing systems are inefficient, beyond their economical life and require <br />extensive maintenance. <br />Library - The units to be replaced consist of 7 packaged rooftop units totaling approximately <br />61 tons. <br />a City Hall - The units to be replaced consist of 2 packaged rooftop units totaling <br />approximately 15 tons. <br />Municipal Building - The units to be replaced consist of 2 Split-DX systems totaling <br />approximately 50 tons. This estimate consists of replacing the existing system with 2 <br />condensing units and 2 air-handling units equipped with VFD's. Please see Section 7.0 in <br />regards to an additional project to improve the overall performance of the Municipal <br />Building's HVAC system. <br />® Public Works Building - The units to be replaced consist of I Packaged Rooftop units <br />totaling approximately 5 tons. <br />® Police Headquarters - The projects consist of replacing the existing chilled and hot water <br />distribution pumps, and installation of Variable Frequency Drives (VFDs) on the new chilled <br />& hot water pumps and existing Air Handling Units. <br />Dunbar Center - The units to be replaced consist of 1 Split-DX system totaling <br />approximately 5 tons. <br />The table below summarizes the estimated cost and savings for replacing the units at each <br />facility. <br />1 <br />HVAC SYSTEM RETROFITS <br /> <br />Building Estimated <br />Implementation Cost Estimated <br />Annual Savin s Pnyback <br />{ears) <br />Library $130,000 $7,200 18.1 <br />City Hull $27,000 $1,600 16.9 <br />Municipal Bldgg. $103,000 $6,200 16.6 <br />Public Works Bldg. $9,000 $700 12.9 <br />Police headquarters $66,000 $4,500 14.7 <br />Dunbar Center $9,000 $500 18.0 <br /> <br />TOTAL $344,000 $20,700 16.6 <br />LOCAL GOVERNMENT ENERGY MANAGEMENT PROGRAh1 ......... _- - PAQL.17
The URL can be used to link to this page
Your browser does not support the video tag.