Laserfiche WebLink
City of San Marcos <br />Water Reuse System <br />Asset Management Plan <br />7.2 Asset Management Business Processes <br />The AMP covers the initial phase of asset management development for San Marcos's water <br />reuse system. This top -down approach leveraged available data and information to build an <br />asset inventory, complete an initial condition assessment, and perform a detailed desk -top risk <br />assessment. As the AMP is implemented, physical inspections and other condition <br />performance measures can be used to refine the baseline data developed in the AMP and <br />improve San Marcos's assessment of the remaining useful life and renewal options for all of its <br />water reuse system assets. <br />The initial baseline data summarized in this plan can be enhanced through the development or <br />refinement of a number of asset management business practices as summarized in the <br />following: <br />1. Asset Register Updates — The updated San Marcos reuse System asset register <br />would be maintained in the existing Maximo CMMS database. Validation and <br />updating of the asset inventory data in the water reuse system asset register should <br />be an ongoing process. <br />2. Asset Condition and Failure Assessments — Validation and update of asset <br />condition data should be continued through maintenance information and field <br />inspections. More detailed asset failure analyses can be developed for high risk <br />assets. <br />3. Performance Data Updates — The San Marcos work order system should be used <br />to enhance the ability to collect performance, service, maintenance, and other asset <br />performance data for each reuse system asset. <br />4. Integrate Operation and Maintenance Practices - The initial asset management <br />plan focuses on asset inventories, condition assessment, and risk assessments to <br />develop capital renewal plans. As the San Marcos asset management program <br />develops, operations and maintenance information should be tied to assets for <br />updating performance and to optimize O &M costs on an asset basis. O &M cost <br />should be combined with the capital cost projections for a total asset cost forecast. <br />5. Update Asset Risk Assessment — Performance data combined with inspection and <br />rehabilitation data can be used to update LOF and COF scores and reprioritize <br />assets based on new ROF scores. <br />February 2016 Page 40 <br />