My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 2016-012/amending chapter 86, article 8 of the san marcos city code regarding the city’s drainage utility by adding supplemental regulations and standards for controlling the introduction of pollutants into the municipal separate storm sewer system (m
San-Marcos
>
City Clerk
>
02 Ordinances
>
2010's
>
2016
>
Ord 2016-012/amending chapter 86, article 8 of the san marcos city code regarding the city’s drainage utility by adding supplemental regulations and standards for controlling the introduction of pollutants into the municipal separate storm sewer system (m
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2016 3:41:48 PM
Creation date
5/26/2016 3:33:47 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Ordinances
City Clerk - Type
Amending
Number
2016-12
Date
5/3/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
construction activity. In addition, the SWPPP shall be amended to <br />identify any new contractor and/or subcontractor that will <br />implement a measure in the SWPPP. <br />(10) Qualified personnel, provided by the operator of the construction <br />site, shall inspect disturbed areas of the construction site that have <br />not been finally stabilized, areas used for storage of materials that <br />are exposed to precipitation, structural control measures, and <br />locations where vehicles enter or exit the site, at least once every <br />seven (7) calendar days. The inspection must occur on a <br />specifically defined day, regardless of whether or not there has <br />been a rainfall event since the previous inspection. <br />Based on the results of the inspections reauired by subsection <br />(c)(10), the site description and/or the pollution prevention <br />measures identified in the SWPPP shall be revised as appropriate, <br />but in no case later than seven (7) calendar days following <br />inspection. Required modifications shall be implemented within <br />seven (7) calendar days following the he inspection. <br />(12) The operator shall retain copies of any SWPPP and all reports <br />required by this Division or by the TPDES permit for the site, and <br />records of all data used to complete the NOI, for a period of at <br />least three (3) years from the date that the site is finally stabilized. <br />(13) Where a site has been finally stabilized (refer to the definition of <br />final stabilization in Section 86.523) and all stormwater discharges <br />from construction activities that are authorized by this Division <br />and by the TPDES permit for those construction activities are <br />eliminated, or where the operator of all stormwater discharges s at a <br />facility changes, the operator of the construction site shall submit <br />to the TCEO a Notice of Termination (NOT) and a copy of the <br />NOT to the City of San Marcos MS4 operator in accordance with <br />the Construction General Permit. The completed and signed NOT <br />shall be submitted to the City via is MyPermitNow.org. <br />Sec. 86.530. Permit Procedure Requirements. <br />The City of San Marcos can enforce compliance with the Cites <br />ordinances, permits, contracts, or orders in accordance with TPDES Phase II MS4 <br />Permit TXR040000. Permitting_ procedure requirements shall be in accordance <br />with the City's LDC, Chapter 2. <br />
The URL can be used to link to this page
Your browser does not support the video tag.