Laserfiche WebLink
Alan Plummer Associates, Inc. <br />Water Master Plan Update 2016 <br /> <br /> Chapter 6 describes the key capital improvement projects for each future year (2020, <br />2025, and 2035) included in this scope and operational changes of the system. <br /> Chapter 7 presents water age runs of the model (which is used as an indicator of water <br />quality) for each state of the systems predicted growth. <br /> Chapter 8 contains the detailed CIP List and related cost for each project for the future <br />year scenarios. <br /> <br />1-2 <br />m:\projects\0600\022-01\doc\report\draft\draftmasterplan-v15_hef.docx <br /> <br />