My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-137/approving a Water Master Plan to guide the future maintenance and extension of the City’s Water Infrastructure
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-137/approving a Water Master Plan to guide the future maintenance and extension of the City’s Water Infrastructure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2016 10:22:57 AM
Creation date
10/17/2016 9:06:15 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2016-137
Date
10/3/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Alan Plummer Associates, Inc. <br />Water Master Plan Update 2016 <br /> <br />Figure 3-3: Old Bastrop Road Permanent Pressure Station Calibration (April 9-11, 2014) <br />110 <br />109 <br />108 <br />107 <br />106 <br />105 <br />104 <br />103 <br />102 <br />101 <br />100 <br />99 <br />SCADAModel <br />98 <br />04812162024283236404448525660646872 <br />Hour <br /> <br />Figure 3-4: Prospect PRV Downstream Pressure Calibration (April 9-11, 2014) <br />70 <br />60 <br />50 <br />40 <br />30 <br />20 <br />10 <br />SCADAModel <br />0 <br />04812162024283236404448525660646872 <br />Hour <br />3-4 <br />m:\projects\0600\022-01\doc\report\draft\draftmasterplan-v15_hef.docx <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.