Alan Plummer Associates, Inc. <br />Water Master Plan Update 2016 <br /> <br />6.3 2035 SYSTEM UPDATES <br />Between 2025 and 2035, the population growth rate is currently projected to slow down as <br />compared with the previous decade. Furthermore, much of the major CIP needs to support the <br />ultimate planning horizon of 2035 will have been completed by 2025. As a result, the capital <br />projects planned for completion between 2025 and 2035 are mostly small diameter pipe <br />upgrades with only a few larger diameter pipeline segments remaining for completion. A fourth <br />high service pump is also anticipated to be required at the SWTP (CIP 37) in order to satisfy <br />regulatory requirements for pumping capacity. The pipeline projects include the following: <br /> <br /> ine along IH-35 North to complete the loop around Tanger <br />Outlets, and <br /> <br />-end). <br />Operationally, the distribution system will operate much like it does in 2025. The Paso Robles <br />and La Cima developments are expected to be built out by this time frame. <br />Figure 6-3 depicts the proposed 2035 system, with all pressure planes identified and minimum <br />pressures under maximum day conditions highlighted. Appendix D contains additional figures <br />showing minimum pressure nodes and fire flow availability results for the 2025 system. <br /> <br /> <br />6-7 <br />m:\projects\0600\022-01\doc\report\draft\draftmasterplan-v15_hef.docx <br /> <br />