Laserfiche WebLink
Ranch <br />Road 12 <br />Commanche <br />Springlake <br />21 <br />^ <br />28 <br />La Cima <br />^ <br />^ <br />^ <br />2041D <br />^ <br />41G <br />29 <br />26 <br />SWTP <br />McCarty <br />35 <br />33 <br />8" <br />16" <br />^ <br />41U <br />2627 <br />16" <br />25 <br />Trunkhill <br />18 <br />22 <br />25 <br />31 <br />23 <br />21 <br />^36 <br />21 <br />Kingswood <br />^ <br />24 <br />^ <br />Soyars <br />Oakridge <br />30 <br />32 <br />^ <br />Cottonwood <br />Additional CIPs (not pictured) <br />CIP No.Description <br />19Drill New Well at Trunkhill or Soyars. <br />34 <br />41 (A to Y)Upgrade all small diameter water lines with 8" minimum. <br />LEGEND <br />City ETJ <br />Facility CIPs* <br />^ <br />Existing City Facilities <br />Existing Elevated Storage <br />Existing Ground Storage <br />Existing Pumps <br />2025: New EST at Trunk Hill <br />2025: Booster Pumps at Trunk Hill <br />2025 Water Line CIPs <br />Small Diameter Lines Upgraded <br />Developer Lines <br />CIP Lines <br />Water Lines in System (2025) <br />Diameter (in) <br /><= 4 <br />6 <br />8 <br />10 - 12 <br />16 <br />18 - 20 <br />24 <br />30 - 36 <br />2025 Pressure Plane (in San Marcos CCN) <br />810' Plane <br />936' Plane <br />1063' Plane <br />Symbology: <br />1 <br /> Major Capital Improvement Project <br />- <br />41A <br /> Small Diamter Line Upgrades <br />FEET <br />010,000 <br />FIGURE 6-2 <br />City of San Marcos: Water Master Plan Update <br />System Overview with 2025 Capital Improvement Projects <br />Document Path: M:\Projects\0600\022-01\GIS\REPORT_FIGURES\v4\FIG06-2_2025_System.mxd <br /> <br />