Laserfiche WebLink
Alan Plummer Associates, Inc. <br />Water Master Plan Update 2016 <br /> <br /> CIP 35: Upgrade small diameter lines along S. LBJ (IH- <br /> CIP 36: Extend existing 12" line further south along E. McCarty Lane toward IH-35 to <br />connect to future growth area. <br />Figure 6-2 depicts the proposed 2025 system, with all pressure planes identified and minimum <br />pressures under maximum day conditions highlighted. Appendix C contains additional figures <br />showing minimum pressure nodes and fire flow availability results for the 2025 system. <br />6-5 <br />m:\projects\0600\022-01\doc\report\draft\draftmasterplan-v15_hef.docx <br /> <br />