My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-137/approving a Water Master Plan to guide the future maintenance and extension of the City’s Water Infrastructure
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-137/approving a Water Master Plan to guide the future maintenance and extension of the City’s Water Infrastructure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2016 10:22:57 AM
Creation date
10/17/2016 9:06:15 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2016-137
Date
10/3/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Alan Plummer Associates, Inc. <br />Water Master Plan Update 2016 <br /> <br />Table 8-2: 2025 CIP List Pipeline and Pump Station Projects <br />CIP # Description Flow Rate or Volume Units TOTAL <br />Pumps at Trunk Hill to fill La Cima Tank and <br />18a 1600 GPM 2 $2,463,000 <br />deliver to 1063' pressure plane <br />New 0.51 MG Elevated Storage for 936' <br />18b 0.51 MG 1 $917,000 <br />pressure plane (Trunk Hill EST) <br />19 Add Well at Trunk Hill or Soyars 1100 GPM 1 $400,000 <br />2025 CIP Pump Station/Tank Total <br />$3,780,000 <br /> <br />Diameter <br />CIP # Description Length (LF) TOTAL <br />(in) <br />Parallel of existing 20"/16" Comanche PS to <br />20 16 4000 $971,000 <br />Franklin St. & RR12 <br />16 4300 $630,000 <br />21 Central Loop in Development Phase I <br />24 6000 $1,554,000 <br />22 Central Loop in Development Phase 2 16 6500 $952,000 <br />Connect Trunk Hill to Sleepy Hollow at Lazy Ln <br />23 12 4900 $442,000 <br />(include flow control valve) <br />24 Connect Paso Robles Loop to Trails End 12 4700 $424,000 <br />Connect Paso Robles Loop to McCarty Ln <br />25 16 6800 $996,000 <br />waterlines <br />Trunk Hill to La Cima PS via new line to and <br />8 1300 $98,000 <br />through La Cima development. Also connect <br />this loop to existing neighborhood (Estates of <br />26 <br />San Marcos) with an 8" new line along W. <br />16 20000 $3,097,000 <br />McCarty Ln. New 8" needs PRV to reduce <br />pressure to 95 psi. <br />Connect McCarty Standpipe to 810 plane via <br />27 16 8400 $2,038,000 <br />Stagecoach <br />Harris Hill Rd from Airport - connect to River <br />28 12 9800 $1,271,000 <br />Ridge Pkwy <br />Extend 12" line from existing 30" along SH 80 <br />29 to edge of CCN, then north along property 12 17000 $2,232,000 <br />boundaries to connect to dead end at airport. <br />McCarty to Centerpoint Extension along Old <br />30 16 5400 $999,000 <br />Bastrop Highway <br />Upgraded lines along Clovis Barker to 16" to tie <br />31 into existing 24". Also upgraded lines along IH-16 5100 $1,040,000 <br />35 to 16" to tie into existing 16" lines. <br />32 Old Bastrop to Existing Line 16 3800 $703,000 <br />Upsize 12" & 8" lines across Stagecoach Trail to <br />33 16 100 $24,000 <br />tie into existing 16" lines on either side. <br /> <br />8-4 <br />m:\projects\0600\022-01\doc\report\draft\draftmasterplan-v15_hef.docx <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.