Laserfiche WebLink
Alan Plummer Associates, Inc. <br />Water Master Plan Update 2016 <br /> <br />Table 8-2: 2025 CIP List Pipeline and Pump Station Projects (continued) <br />Diameter <br />CIP # Description Length (LF) TOTAL <br />(in) <br />Extend 8" line from existing terminus of 12" <br />34 line in Old Bastrop to Francis Harris, then along 8 13300 $772,000 <br />Francis Harris to power plant. <br />Upgrade small diameter line in S. LBJ from E. <br />35 12 1700 $242,000 <br />Grove St. to IH-35 Crossing <br />Extend existing 12" line further south along E. <br />36 McCarty Lane toward IH-35 to connect to 12 1100 $157,000 <br />future growth area. <br />Upsize lines to 8" PVC along Aquarena Springs <br />41D Dr. & nearby lines north of IH-35 (all in 8 3000 $309,000 <br />Millview West neighborhood). <br />Upsize lines to 8" PVC in Rio Vista <br />41G 8 6800 $700,000 <br />neighborhood (NW of IH-35 & RR 12). <br />Upsize lines to 8" PVC in Victory Gardens <br />(Sherwood St., Weatherford St., Jones St., & <br />41U 8 3100 $319,000 <br />Armstrong St.) & Sunset Acres (Del Sol St.) <br />neighborhoods. <br />2025 CIP Pipeline Total $19,970,000 <br /> <br /> <br /> <br />8-5 <br />m:\projects\0600\022-01\doc\report\draft\draftmasterplan-v15_hef.docx <br /> <br />