My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-137/approving a Water Master Plan to guide the future maintenance and extension of the City’s Water Infrastructure
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-137/approving a Water Master Plan to guide the future maintenance and extension of the City’s Water Infrastructure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2016 10:22:57 AM
Creation date
10/17/2016 9:06:15 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2016-137
Date
10/3/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Alan Plummer Associates, Inc. <br />Water Master Plan Update 2016 <br /> <br />Table 8-2: 2025 CIP List Pipeline and Pump Station Projects (continued) <br />Diameter <br />CIP # Description Length (LF) TOTAL <br />(in) <br />Extend 8" line from existing terminus of 12" <br />34 line in Old Bastrop to Francis Harris, then along 8 13300 $772,000 <br />Francis Harris to power plant. <br />Upgrade small diameter line in S. LBJ from E. <br />35 12 1700 $242,000 <br />Grove St. to IH-35 Crossing <br />Extend existing 12" line further south along E. <br />36 McCarty Lane toward IH-35 to connect to 12 1100 $157,000 <br />future growth area. <br />Upsize lines to 8" PVC along Aquarena Springs <br />41D Dr. & nearby lines north of IH-35 (all in 8 3000 $309,000 <br />Millview West neighborhood). <br />Upsize lines to 8" PVC in Rio Vista <br />41G 8 6800 $700,000 <br />neighborhood (NW of IH-35 & RR 12). <br />Upsize lines to 8" PVC in Victory Gardens <br />(Sherwood St., Weatherford St., Jones St., & <br />41U 8 3100 $319,000 <br />Armstrong St.) & Sunset Acres (Del Sol St.) <br />neighborhoods. <br />2025 CIP Pipeline Total $19,970,000 <br /> <br /> <br /> <br />8-5 <br />m:\projects\0600\022-01\doc\report\draft\draftmasterplan-v15_hef.docx <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.