My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-137/approving a Water Master Plan to guide the future maintenance and extension of the City’s Water Infrastructure
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-137/approving a Water Master Plan to guide the future maintenance and extension of the City’s Water Infrastructure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2016 10:22:57 AM
Creation date
10/17/2016 9:06:15 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2016-137
Date
10/3/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Alan Plummer Associates, Inc. <br />Water Master Plan Update 2016 <br /> <br />Table 8-3: 2035 CIP List Pipeline and Pump Station Projects <br />Flow Rate or <br />CIP # Description Units TOTAL <br />Volume <br />37 New Pump at SWTP Pump Station 3250 GPM 1 $473,000 <br />2035 CIP Pump Station/Tank Total $473,000 <br /> <br />Diameter <br />CIP # Description Length (LF) TOTAL <br />(in) <br />Centerpoint to Posey Rd Extension along Old <br />38 Bastrop Highway, Include connection to existing 12 5700 $675,000 <br />line on Horace Howard Dr. <br />Connect existing 24" to end of proposed 12" <br />39 12 2100 $379,000 <br />developer line along IH-35 north of Centerpoint <br />New 12" line connecting end of 16" in Blanco <br />40 12 1700 $201,000 <br />Vista Blvd to 8" line in Post Rd via Yarrington Rd <br />Upsize lines to 8" PVC along & north of Post <br />41A 8 5300 $634,000 <br />Road including Claremont Dr. <br />Upsize lines to 8" PVC that serve areas along IH- <br />41C 35 in Millview East neighborhood including 8 1900 $196,000 <br />Miller Tree & Meiners St. <br />Upsize lines to 8" PVC along Davis Lane, south <br />41E 8 4200 $432,000 <br />of IH-35 in Two Rivers East neighborhood area. <br />Upsize lines to 8" PVC in Blanco Gardens <br />neighborhood. Includes lines south of IH-35 in <br />41F 8 4100 $422,000 <br />mostly residential area crossing Sherbarb St. & <br />along Conway Dr.& Sturgeon Dr. <br />Upsize lines to 8" PVC in Spring Lake Hills <br />41H neighborhood (E. & W. Mimosa Circle & around 8 4800 $574,000 <br />Rodger's Ridge St.) <br />Upsize lines to 8" PVC in Fairlawn neighborhood <br />41I 8 1300 $134,000 <br />along Crepe Myrtle Dr. & IH-35 frontage road. <br />Upsize lines to 8" PVC in Forest Hills <br />41J neighborhood along cul-de-sacs on Quail Creek 8 800 $96,000 <br />Dr. & near Peques St. <br />Upsize lines to 8" PVC in Sessom Creek <br />41K 8 3100 $371,000 <br />neighborhood. <br />Upsize lines to 8" PVC on short cul-de-sac <br />41L 8 300 $36,000 <br />streets in Holland Hills neighborhood. <br />8-6 <br />m:\projects\0600\022-01\doc\report\draft\draftmasterplan-v15_hef.docx <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.