Laserfiche WebLink
• Public Safety Facilities <br />o The Landowner will pay costs, in an amount not to exceed $500,000, <br />associated with the construction of a new Fire Station per the Fire Station <br />Agreement entered into the City and Landowner on November 2, 2015. <br />• Entry Monumentation -Highway 35 and Segment B <br />o The entry monumentation portion of the Major Improvements consists of <br />construction and installation of a signature project announcement <br />monument, along with associated landscaping, hardscaping, and irrigation at <br />the I-35 entry to the project. The monument will be a combination of <br />masonry walls, structures with metal signage and associated lighting. <br />Description <br />Tota I <br />Authorized Improvements <br />Street Improvements <br />$ 1,471,151 <br />Drainage Improvements <br />468,538 <br />Erosion & Sedimentation Control <br />48,500 <br />Water Line Distribution <br />384,645 <br />Waste Water <br />122,250 <br />Sewer Lift Station A <br />640,411 <br />Sewer Lift Station B <br />1,384,544 <br />Landscaping - Arterial Roads <br />787,000 <br />Landscaping - Open Space incl. Trails Systems <br />435,000 <br />Posey Road - Street Improvements <br />200,000 <br />Offsite Improvements/ROW/Offsite Easements <br />- <br />Public Safety Facilities <br />500,000 <br />Entry Monumentation - Hwy 35 and Seg B <br />200,000 <br />Soft Costs <br />996,306 <br />Contingency <br />1,336,710 <br />Construction Management <br />359,002 <br />Total Authorized Improvements <br />$ 9,334,058 <br />13 <br />