My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-165/approving an interlocal agreement with the Guadalupe-Blanco River Authority in an amount not to exceed $313,450.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-165/approving an interlocal agreement with the Guadalupe-Blanco River Authority in an amount not to exceed $313,450.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 8:05:58 AM
Creation date
12/12/2016 8:30:22 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2016-165
Date
11/15/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- Refinement of the structure databases to include more accurate stream stationing, <br />floor elevations, and structure values. <br />- Refinement of the Hydrology model for a more detailed determination of the <br />effects associated with the detention alternatives. <br />- On-site investigation of potential detention sites on both the lower Guadalupe <br />watershed above New Braunfels (Bear Creek area), and upstream of Wimberley. <br />This may impact geotechnical and environmental considerations, in particular. <br />- Development of preliminary channel modification plans in San Marcos. While <br />preliminary costs and benefits have been developed for the other three structural <br />measures, the channel modification measure remains fully untested at this point in <br />time. <br />Schedule: <br />The study schedule will include — and will remain current — for (1) the key milestones <br />required by the annual Execution Engineering Circulars (ECs) to be locked and to <br />remain current, and (2) milestones subject to the notification requirements <br />documented in the Implementation Guidance for Section 1002 of WRRDA 2014 <br />(Consolidation of Studies), including (but not limited to): <br />SMART <br />Milestone <br />Code <br />Milestone <br />Date <br />CW261 <br />Alternatives Milestone'' " <br />16 -Nov -16 <br />CW262 <br />TSP Milestone <br />06 -Dec -17 <br />CW250 <br />Public Review Period Start <br />30 -Jan -18 <br />CW263 <br />A gency Decision Milestone <br />25 -Ma -18 <br />Submit Final Report (Division Engineer's <br />CW160 - <br />Notice) <br />24 -Dec -18 <br />CW245 <br />Conduct CWRB <br />22 -Feb -19 <br />CW270 <br />Chief Signs Report of the Chief of Engineers <br />07 -Jun -19 <br />ASA(CW) Signs Record of Decision if Not <br />CW230 <br />Authorized <br />21 -Jun -19 <br />CW180 <br />Feasibilitv Report to Con ress <br />13 -Dec -19 <br />See the attached P2 Schedules (P2# 326395) dated 11 October 2016. Two views <br />attached: Date View and WBS View. <br />Risk Management Plan: <br />Safety and health risks are considered very low since most activities will be <br />accomplished within the office environment, <br />Changes in scope, schedule, and costs are the biggest risks of failing to meet the project <br />on time within the existing budget. If any of the project assumptions are inaccurate, then <br />Draft PMP XX October 2016 <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.