Laserfiche WebLink
Table 1 <br />WJ-M=— <br />___ '' <br />Damage areas benerited <br />Lower Gua a <br />. ....................... . ... . . .................... _... <br />R <br />�;p uiver <br />Bear Creek Detention <br />. . . . ........ <br />tNew Bra�,g <br />......... .............. ............. .......... eLs��,m . . . . . ............................................ <br />"We <br />I- <br />■ I I <br />W <br />7-- <br />w B r a unfels/Sequin <br />River <br />................................. . .. . ..... . . . ........ ........... <br />Blanco River Detention <br />.. . ....................... . ... <br />Wimberlq <br />. . ......... <br />ME W <br />*II <br />San Marcs <br />San os Channel Modification <br />San Marcos <br />. . . . . ...... . ...................... . . . ..... ..... . <br />anco River Detention and Bypass Creek <br />Wimberley, San Marcos <br />Diversion <br />........ ..... <br />Blanco River Detention and Channel <br />.. ........ . ........ - - - - ---------- <br />imberley San Marcos <br />Modification <br />Blanco River Detention, Channel 11 <br />---------- . . ........ . . . __j,.'j,.'j_j,.'j,.­­ ........................ <br />Wimberley, San Marcos <br />Modification, and Bvvass Creek Diversion <br />.... . ... <br />Wimberley, San Marcos--..,$ <br />Rescoping to Alternative Milestone (AMM)- General Scope (34 months) <br />The PDT will formulate a focused array of alternatives and will have identified the <br />criteria that will be used to evaluate and compare alternatives to reach the Tentatively <br />Selected Plan milestone, PDT is currently ready for the Alternatives Milestone Meeting. <br />In Corps parlance, this meeting is an In -progress Review (IPR), and can be conducted <br />virtually or in person. <br />The PDT has continued strategic interactions with the vertical team (including the RIT, <br />ATR lead and OWPR lead) during in -progress reviews (IPRs) with SWD and informal <br />communication, as needed. District Quality Control will be engaged in this earliest phas,� <br />-if the study. <br />Read-aheads and Deliverables: <br />1. Draft Report Synopsis <br />2, Risk Register <br />3. Decision Management Plan <br />Overall Team Tasks: <br />• PDT Meetings <br />• Public co in Scoping Meeting <br />• Existing Conditions Analysis <br />• Initial is Formulation Activities <br />• Input into Report Synopsis, Risk Register, and DMP <br />• Preparation for the AMM <br />• AMM <br />0 <br />