Laserfiche WebLink
• Initiate any Planning Model Approvals, if required (to be identified in review <br />plan) <br />AMM to Tentatively Selected Plan Milestone (TSP) — General Scoae (13-14 months) <br />During this phase of the feasibility study, the PDT develops conceptual designs and <br />parametric cost estimates for the focused array of alternatives. Economic and <br />environmental evaluations will be completed to inform selection of a final array of <br />alternatives leading to the TSP. The TSP Milestone meeting ensures Vertical Team <br />concurrence on the TSP that will be released as part of the EIS for public and agency <br />review. The EIS will be close to complete, and District Quality Control (DQC)will 'be <br />conducted prior to the TSP milestone. <br />Read-aheads and Deliverables: <br />1. Draft Report Synopsis <br />2. Risk Register <br />3. Decision Management Plan <br />4. Biological Assessment (BA)(Draft) <br />5. Draft Fish & Wildlife Coordination Act Report (FWCAR)/Planning Aid <br />Letters (PAL) <br />Overall Team Tasks: <br />• PDT Meetings <br />• Stakeholder/Agency Outreach Meetings <br />• Evaluation and comparison of FRM alternatives <br />• Conceptual cost estimate <br />• Conceptual' design, including mitigation plan <br />• Select TSP, <br />• Planning Tools: Report Synopsis, Decision Log, Risk Register, and DMP <br />• Preparations for TSP Milestone Meeting (multiple IPRs) <br />• TSP Milestone Meeting <br />TSP to Agency Decision Milestone (ADM) (4-5 Months) <br />This phase of the study includes finalizing the draft Integrated FR/EIS for concurrent <br />ATR, Independent External Peer Review (IEPR), Policy, and reviews. There will be a 45 - <br />day public review period for the FR/EIS. The PDT is responsible for responses to review <br />comments, and any revisions made to the FR/EIS based on review comments (report <br />revisions are not required before the ADM, but can be in -progress). At this milestone the <br />PDT will discuss and get concurrence from the Vertical Team on significant review <br />Draft PMP — XX October 2016 <br />2 <br />