My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-165/approving an interlocal agreement with the Guadalupe-Blanco River Authority in an amount not to exceed $313,450.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-165/approving an interlocal agreement with the Guadalupe-Blanco River Authority in an amount not to exceed $313,450.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 8:05:58 AM
Creation date
12/12/2016 8:30:22 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2016-165
Date
11/15/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Initiate any Planning Model Approvals, if required (to be identified in review <br />plan) <br />AMM to Tentatively Selected Plan Milestone (TSP) — General Scoae (13-14 months) <br />During this phase of the feasibility study, the PDT develops conceptual designs and <br />parametric cost estimates for the focused array of alternatives. Economic and <br />environmental evaluations will be completed to inform selection of a final array of <br />alternatives leading to the TSP. The TSP Milestone meeting ensures Vertical Team <br />concurrence on the TSP that will be released as part of the EIS for public and agency <br />review. The EIS will be close to complete, and District Quality Control (DQC)will 'be <br />conducted prior to the TSP milestone. <br />Read-aheads and Deliverables: <br />1. Draft Report Synopsis <br />2. Risk Register <br />3. Decision Management Plan <br />4. Biological Assessment (BA)(Draft) <br />5. Draft Fish & Wildlife Coordination Act Report (FWCAR)/Planning Aid <br />Letters (PAL) <br />Overall Team Tasks: <br />• PDT Meetings <br />• Stakeholder/Agency Outreach Meetings <br />• Evaluation and comparison of FRM alternatives <br />• Conceptual cost estimate <br />• Conceptual' design, including mitigation plan <br />• Select TSP, <br />• Planning Tools: Report Synopsis, Decision Log, Risk Register, and DMP <br />• Preparations for TSP Milestone Meeting (multiple IPRs) <br />• TSP Milestone Meeting <br />TSP to Agency Decision Milestone (ADM) (4-5 Months) <br />This phase of the study includes finalizing the draft Integrated FR/EIS for concurrent <br />ATR, Independent External Peer Review (IEPR), Policy, and reviews. There will be a 45 - <br />day public review period for the FR/EIS. The PDT is responsible for responses to review <br />comments, and any revisions made to the FR/EIS based on review comments (report <br />revisions are not required before the ADM, but can be in -progress). At this milestone the <br />PDT will discuss and get concurrence from the Vertical Team on significant review <br />Draft PMP — XX October 2016 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.