My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-165/approving an interlocal agreement with the Guadalupe-Blanco River Authority in an amount not to exceed $313,450.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-165/approving an interlocal agreement with the Guadalupe-Blanco River Authority in an amount not to exceed $313,450.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2017 8:05:58 AM
Creation date
12/12/2016 8:30:22 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2016-165
Date
11/15/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
cominems, nutMjeT, a of ctimpffilon oir = Nffri <br />designs. PDT will participate and assist with preparation of ADM meeting. <br />Read-aheads and Deliverables: <br />1. Draft Integrated FR/EIS, including appendices <br />2. Updated Report Synopsis <br />3. <br />is Register <br />4. Decision Log <br />5. Decision Management Plan <br />6. Concurrent Review Summary (public, technical, policy, legal and IEPR) <br />Overall Team Tasks: <br />• PDT Meetings <br />• Write Sections of DFRIEIS + Appendices <br />• DQC of DFRJEIS + Appendices <br />Response to DQC comments; revise DFRJEIS <br />ATR, TEPR, Southwestern Division (SWD), Headquarters (HQ) Policy, and <br />Public Reviews (response to comments + report revisions) <br />Public Meeting; 45 -day public review period <br />Update Planning Tools: Report Synopsis, Decision Log, Risk Register, and DMP <br />Prep for ADM Meeting (including 1PRs) <br />Participate in ADM Meeting <br />This phase of the study allows for additional feasibility level (35%) design of the <br />recommended plan to reduce risk and uncertainty with cost data, engineering <br />effectiveness, environmental impacts and economic benefits. The PDT will finalize th& <br />Inte2rated F11EIS as well for MSC review. review. <br />I . Detailed Engineering Analyses <br />2. Final Integrated FRJEIS, with final appendices <br />3. Draft Record of Decision (ROD) <br />4. Biological Opinion(s) (BO) must be submitted with final FR/EIS <br />5. Report Summary, Decision Log, Risk Register, DMP, draft Chief's Report, <br />draft Chief's Responses to IEPR, and other submittal requirements for final <br />report per Engineer Regulation (ER) 1105-2-100, Appendix H, Exhibit HT <br />Feasibility -level design, cost estimate, real estate, <br />DQC of Final FR/EIS + comment response + report revisions <br />r#1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.