ARTICLE V <br /> CONCEPT PLAN AND FACILITIES <br /> Section 5.01 Concept Plan and Permitted Uses. All development within the Property shall comply with (i) <br /> the Concept Plan attached hereto as Exhibit B, (ii) Table 1 in Section 4.02 of this Agreement and Tables 2 and 3 <br /> in Section 8.01 of this Agreement, (iii) the City Codes (as modified by Exhibit C, Development Waivers, in <br /> accordance with Section 2.02 of this agreement, and otherwise by this Agreement), (iv) the Roadway Design <br /> Standards and Typical Cross Sections described in Exhibits E and E-1, and (v) the terms and conditions of this <br /> Agreement. <br /> Section 5.02 Future ISD Facilities. The areas generally depicted on the Concept Plan as `Schools' shall be <br /> dedicated to either the Lockhart ISD ("LISD") or the San Marcos ISD ("SMISD" (LISD and SMISD are <br /> collectively referred to herein as "ISD") for use as either an elementary or middle school. Such dedication to <br /> occur at a time that shall be mutually agreed upon between the Owner and the ISD, but no sooner than a period <br /> of three (3)years after the time the Subdivision Concept Plat for that parcel is approved, and no later than five <br /> (5)years after the date the Preliminary Subdivision Plat for that parcel is approved. If the ISD district fails to <br /> accept the property within the foregoing timeframes, then the property may be developed in a manner <br /> compatible with adjacent uses, as shown in Exhibit B. <br /> Section 5.03 ESD/Future COSM Public Safety Facility. The Primary Owner shall reserve two (2) sites <br /> ated adjacent to a major thoroughfare,in the project within 1/4 quarter road miles(measured along public roads) <br /> _om the locations specified on Exhibit B-2,for the purpose of future locations for fire and EMS facilities("Public <br /> Safety Facility Sites"). Each Public Safety Facility Site shall be a minimum of three (3) acres. In the event that <br /> Primary Owner desires to move the Public Safety Facility Site beyond 1/4 road miles from the location(s) shown <br /> on Exhibit B, this may be done administratively, if the City agrees to the new location; provided, however, if the <br /> Primary Owner and the City are unable to reach an agreement regarding the relocation of the Public Safety Facility <br /> Site, this will be resolved through the Major Amendment Process outlined in Section 16.01 of this Agreement. <br /> The fire and EMS facilities (the "Public Safety Facilities") to be constructed on the Public Safety Facility Sites <br /> will be constructed in accordance with the following schedules: <br /> (i) Within six (6) months after Cotton Center has reached two thousand (2,000) Residential Utility <br /> Connections, either (1) the ESD serving Cotton Center or (2) the ESD serving Cotton Center in <br /> conjunction with the Primary Owner; or (3) Primary Owner, shall commence construction of a <br /> Public Safety Facility on the Public Safety Facility Sites located within proposed Sub-District 1 as <br /> shown on Exhibit B-1, and shall complete construction of such Public Safety Facility within one <br /> (1) year following commencement of construction; and <br /> (ii) Within six (6) months after Cotton Center has reached four thousand (4,000) Residential Utility <br /> Connections, either (1) the ESD serving Cotton Center or (2) the ESD serving Cotton Center in <br /> conjunction with the Primary Owner, or (3) Primary Owner shall commence construction of the <br /> second Public Safety Facility on the Public Safety Facility Site located within proposed Sub- <br /> District 4 as shown on Exhibit B-1, and shall complete construction of such Public Safety Facility <br /> within one (1)year following commencement of construction. <br /> 13 <br />