My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-164/approving a Development Agreement between the City and Walton Texas LP, Walton Silver Crossing LP, Walton TX Austin Land LP, Walton TX Martindale LP, and Walton Texas Martindale LP 2 for approximately 2,358 acres out of the William Pettus Le
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-164/approving a Development Agreement between the City and Walton Texas LP, Walton Silver Crossing LP, Walton TX Austin Land LP, Walton TX Martindale LP, and Walton Texas Martindale LP 2 for approximately 2,358 acres out of the William Pettus Le
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2017 4:42:31 PM
Creation date
12/20/2016 2:41:30 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Agreement
Number
2016-164
Date
12/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CODE REFERENCE CODE STANDARD PROPOSED <br /> MODIFICATION <br /> (o) Construction of Streets. All streets shall be Modify requirement and <br /> constructed in accordance with paving widths and replace it with the <br /> specifications as set forth in the TCSS of the City following language <br /> of San Marcos at the time at which the preliminary "Construction of Streets. <br /> plat application is officially submitted and deemed All streets shall be <br /> a complete application. constructed in accordance <br /> Article 4, Division 1, with paving widths and <br /> Section 7.4.1.4 (o)— specifications as set forth <br /> Specific Street Standards in Exhibits "E", "E-1" <br /> and "E-2" attached <br /> hereto at the time a <br /> preliminary plat <br /> application is officially <br /> submitted and deemed <br /> complete." <br /> (b) Design Storm Event. All drainage facilities Modify requirement and <br /> (including street curbs, gutters, inlets and storm replace it with the <br /> wastewaters) shall be designed to intercept and following language <br /> transport runoff from a 25-year frequency storm. "Design Storm Event. All <br /> The drainage system shall be designed to convey drainage facilities <br /> those flows greater than a 25-year frequency, up to (including street curbs, <br /> and including a 100-year frequency storm within gutters, inlets and <br /> defined rights-of-way or drainage easements. Peak stormwaters) shall be <br /> flows shall not be increased at any location for the designed to intercept and <br /> 2-, 5-, 10-, 25-, 50- or 100-year storm frequency transport runoff from a <br /> which causes increased inundation of any building 25 year frequency storm. <br /> Article 5, Division 1, or roadway surface. The drainage system shall <br /> Section 7.5.1.1 (b)— Storm be designed to convey <br /> Water Collection and those flows greater than a <br /> Drainage Conveyance. 25 year frequency, up to <br /> and including a 100 year <br /> frequency storm within <br /> defined rights-of-way or <br /> drainage easements. <br /> Peak flows shall not be <br /> increased at any location <br /> for the 2, 10, 25, or 100 <br /> year-storm frequency <br /> which causes increased <br /> inundation of any building <br /> or roadway surface." <br />
The URL can be used to link to this page
Your browser does not support the video tag.