Laserfiche WebLink
11. Maintenance Responsibilities of Each Party: Each Party will be fully responsible for <br />the maintenance of the equipment it owns. <br />12. Other Terms and Conditions: <br />• The City and LCRA TSC are to share access to the substation by LCRA TSC <br />locks in the gate and in the control house doors. <br />SMEU will provide LCRA TSC access to 125 VDC. Circuits must have over current <br />current protection devices (OCPD) sized according to NEC standards. Panel <br />boards containing the OCPD may belong to either SMEU (if space is available) or <br />LCRA TSC. <br />• LCRA TSC will provide SMEU access to 120 VAC power. Circuits must have <br />over current protection devices (OCPD) sized according to NEC standards. Panel <br />boards containing the OCPD may belong to either SMEU (if space is available) or <br />LCRA TSC. <br />• SMEU will provide LCRA TSC with floor space (as available and as necessary) <br />in its control houses for the installation of LCRA TSC required relay panel boards <br />and equipment. <br />• LCRA TSC and SMEU shall design, provide, and coordinate their respective <br />protection system equipment so that adjacent zones of protection overlap, in <br />accordance with ERCOT Nodal Operating Guides. <br />LCRA TSC — San Marcos Electric Utility First Amended IA Page 21 of 39 <br />