My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-177/approving an amended and restated Interconnection Agreement with the LCRA Transmission Services Corporation (“LCRA TSC”) to, among other things, clarify the transmission and distribution functions of the parties, provide metering to be gover
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-177/approving an amended and restated Interconnection Agreement with the LCRA Transmission Services Corporation (“LCRA TSC”) to, among other things, clarify the transmission and distribution functions of the parties, provide metering to be gover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 12:56:52 PM
Creation date
1/23/2017 1:06:35 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2016-177
Date
12/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LCRA TSC owns: <br />McCarty Lane Substation including, but not limited to, the following items: <br />• 138 kV bus, switches, and structures for transformer PWT -1 <br />• One (1) 138 kV circuit switcher CS -9655 with bypass switch 9657 and disconnect <br />switch 9654 <br />• One (1) power transformer PWT -1, T-1 with associated surge arresters <br />• Three (3) distribution and total bays including A -frames, trusses, insulators, <br />disconnect switches, 12.5 kV operating and transfer bus, bus potential <br />transformers and metering current transformers <br />• Station Service equipment <br />• Control house with station battery <br />10. Operational Responsibilities of Each Party: Each Party will be responsible for the <br />operation of the equipment it owns. <br />11. Maintenance Responsibilities of Each Party: Each Party will be fully responsible for <br />the maintenance of the equipment it owns. <br />12. Other Terms and Conditions: <br />• The City and LCRA TSC are to share access to the substation by LCRA TSC <br />locks in the gate and in the control house doors. <br />• LCRA TSC will provide SMEU access to 125 VDC and 120 VAC power. <br />Circuits must have over current protection devices (OCPD) sized according to <br />NEC standards. Panel boards containing the OCPD may belong to either SMEU <br />(if space is available) or LCRA TSC. <br />• LCRA TSC will provide SMEU with floor space (as available and as necessary) <br />in its control houses for the installation of SMEU required relay panel boards and <br />equipment. <br />• LCRA TSC and SMEU shall design, provide, and coordinate their respective <br />protection system equipment so that adjacent zones of protection overlap, in <br />accordance with ERCOT Nodal Operating Guides. <br />LCRA TSC — San Marcos Electric Utility Page 24 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.