My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-177/approving an amended and restated Interconnection Agreement with the LCRA Transmission Services Corporation (“LCRA TSC”) to, among other things, clarify the transmission and distribution functions of the parties, provide metering to be gover
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-177/approving an amended and restated Interconnection Agreement with the LCRA Transmission Services Corporation (“LCRA TSC”) to, among other things, clarify the transmission and distribution functions of the parties, provide metering to be gover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 12:56:52 PM
Creation date
1/23/2017 1:06:35 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2016-177
Date
12/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FACILITY SCHEDULE NO. 6 <br />1. Name: San Marcos Substation <br />2. Facility Location: The San Marcos Substation is located at 1301 River Road, San <br />Marcos, Hays County, Texas. <br />3. Points of Interconnection: There are four (4) points of interconnection at San Marcos <br />Substation generally described as: <br />• where the jumper from switch 3942 on the transformer bus for power transformer T- <br />1 connects to the 13 8 kV operating bus. <br />• where the jumper from switch 3944 on the transformer bus for power transformer T-1 <br />connects to the 13 8 kV transfer bus. <br />• where the jumper from switch 4986 on the transformer bus for power transformer T- <br />2 connects to the 13 8 kV operating bus. <br />• where the jumper from switch 4987 on the transformer bus for power transformer T-2 <br />connects to the 13 8 kV transfer bus. <br />4. Transformation Services Provided by LCRA TSC: No <br />5. Metering Services Provided by LCRA TSC: Yes, per separate Wholesale Metering <br />Service Agreement <br />6. Delivery Voltage: 138 kV <br />7. Metered Voltage and Location: The metered voltage is 12.5 kV. The metering current <br />transformers are located in the two power transformers (T-1 and T-2). The two metering <br />potential transformers are located on the two 12.5 kV operating buses. <br />8. One Line Diagram Attached: Yes <br />9. Description of Facilities Owned by Each Party: <br />San Marcos Electric Utilities owns: <br />• Two (2) transformers T-1 and T-2 with associated surge arresters <br />• Two (2) circuit switchers CS -4975 and CS -4985 <br />• Six (6) 138 kV disconnect switches 4974, 3942, 3944, 4984, 4986 and 4987. <br />• Jumpers from the disconnect switches 3942, 3944, 4986 and 4987 to the Points of <br />Interconnection at the 138 kV operating and transfer buses. <br />• 138 kV transformer bus with associated steel structures and insulators <br />• Two (2) 138 kV surge arresters SA -7 and SA -9 <br />• All distribution and total circuit breakers including jumpers, protective relay <br />packages and foundations. <br />• All distribution and total bays including A -flames, trusses, foundations, <br />LCRA TSC — San Marcos Electric Utility Page 33 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.