My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2016-177/approving an amended and restated Interconnection Agreement with the LCRA Transmission Services Corporation (“LCRA TSC”) to, among other things, clarify the transmission and distribution functions of the parties, provide metering to be gover
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2016
>
Res 2016-177/approving an amended and restated Interconnection Agreement with the LCRA Transmission Services Corporation (“LCRA TSC”) to, among other things, clarify the transmission and distribution functions of the parties, provide metering to be gover
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 12:56:52 PM
Creation date
1/23/2017 1:06:35 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2016-177
Date
12/20/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
insulators, disconnect switches, surge arresters, 12.5 kV operating and transfer <br />bus, and bus potential transformers <br />• Two (2) station service SS -1 and SS -2 <br />LCRA TSC owns: <br />The San Marcos Substation including, but not limited to, the following items: <br />• The site (property), including site work, fence, gravel, ground grid and other <br />appurtenances <br />• 13 8 kV operating and transfer bus <br />• One (1) 138 kV bus potential transformer PT -1 <br />• One (1) 138 kV bus differential and breaker failure relaying scheme <br />• Two (2) metering package <br />• One (1) 138 kV surge arrester SA -6 <br />• Underfrequency relay panel <br />• Control house and station battery <br />10. Operational Responsibilities of Each Party: Each Party will be responsible for the <br />operation of the equipment it owns. LCRA TSC shall operate the SMEU 138 kV <br />equipment, including monitoring the SMEU power transformer alarms. <br />11. Maintenance Responsibilities of Each Party: Each Party will be fully responsible for <br />the maintenance of the equipment it owns. <br />12. Other Terms and Conditions: <br />• The City and LCRA TSC are to share access to the substation by LCRA TSC <br />locks in the gate and in the control house doors. <br />• The City will supply and allow LCRA TSC use of its 12.5 kV bus potential <br />transformers PT -3 and PT -4 for metering. <br />• The City will supply and allow LCRA TSC use of transformer T-1 and T-2 <br />metering current transformers for its metering. <br />• The City will supply and allow LCRA TSC use of transformer T-1 and T-2 <br />relaying current transformers for LCRA TSC's bus differential & breaker failure <br />relaying scheme. <br />• The City will provide breaker failure initiate contacts from its circuit switchers <br />CS4975 and CS4985 relaying panel to LCRA TSC's bus differential & breaker <br />failure relaying panel. <br />• LCRA TSC will provide tripping and close inhibit contacts from its bus <br />differential & breaker failure relaying panel to City's circuit switchers CS4975 <br />and CS4985 relaying panels. <br />• LCRA TSC will provide City access to 125 VDC and 120 VAC power. Circuits <br />must have over current protection devices (OCPD) sized according to NEC <br />standards. Panel boards containing the OCPD may belong to either LCRA TSC <br />(if space is available) or City. <br />• The City will supply and allow LCRA TSC use of Station Service 41 and <br />Station Service #2 for primary and backup station power. <br />LCRA TSC — San Marcos Electric Utility Page 34 of 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.