Laserfiche WebLink
LA CIMA - FRANKLIN LIFT STATION <br />PID MPA BID - 001A <br />Bid Opening: December 1, 2016 <br />Rockin Q Construction, LLC <br />Yes <br />Bid Bond <br />Yes <br />Addendum #1 Acknowledged <br />1.0 GENERAL CONSTRUCTION <br />Unit <br />Bid ItemQuantityDescription Unit PriceAmount <br />$2,000.00$2,000.00 <br />Traffic Control <br />1.11LS <br />$1,200.00$1,200.00 <br />Project Signs <br />1.21EA <br />$25,000.00$25,000.00 <br />Mobilization <br />1.31LS <br />SUBTOTAL GENERAL <br />$28,200.00 <br />2.0 FRANKLIN LIFT STATION MISC. IMPROVEMENTS <br />Unit <br />Bid ItemQuantityDescription Unit PriceAmount <br />Remove and Replace Existing Pumps with new 60HP Pumps per Contract <br />2.1$79,000.00$237,000.00 <br />3EA <br />Documents, include all associate work, equipment and material for removal, haul <br />Remove and Replace Existing Guiderails with New SS 316 Guiderails incl. all <br />2.2$1,100.00$6,600.00 <br />6EA <br />associate work, equipmenta and material for removal, haul off and disposal per <br />Remove and Replace Existing Floats with new SS 316 Float Mounting Assembly <br />2.3$3,500.00$3,500.00 <br />1LS <br />per contract documents, incl. all associate work, equipment and material for <br />Remove and Replace Existing discharge pipes from 6-inch DIP to 8-inch DIP per <br />2.4$80,000.00$80,000.00 <br />1LS <br />contract documents, incl. combination air release valve, check and gate valves, <br />2.4$30.00$750.00 <br />25LFFurnish and Install Wood Fence Match Existing per COSM Standards. <br />2.5$2,500.00$2,500.00 <br />1EAFurnish and Install Wood Fence Gate Match Existing per COSM Standards. <br />2.6Furnish, install, maintain and remove Silt Fence.$5.00$255.00 <br />51LF <br />Franklin Lift Station Electrical improvements include pump Control Panel, <br />2.7$112,300.00$112,300.00 <br />1LS <br />Electrical Rack, Generator Connection Box, Manual Transfer Switch, Mini-Power <br />2.8By-pass Pumping required for the wet well lining.$22,000.00$22,000.00 <br />1LS <br />FRANKLIN LIFT STATION MISC. IMPROVEMENTS <br />$464,905.00 <br />3.0 CITY OF SAN MARCOS IMPROVEMENTS <br />Unit <br />Bid ItemQuantityDescription Unit PriceAmount <br />Install lining, corrosion resistant, spray or bruch applied material that shall be <br />$20,000.00$20,000.00 <br />1LS <br />3.1 <br />urethane, polyurethane or epoxy. 400 Series High Build Epoxy Liner, 80 mils <br />By-pass Pumping required for the wet well lining.$5,500.00$5,500.00 <br />1LS <br />3.2 <br />SUBTOTAL CITY OF SAN MARCOS IMPROVEMENTS <br />$25,500.00 <br />BID SUMMARY <br />$28,200.00 <br />1. GENERAL CONSTRUCTION <br />$464,905.00 <br />2. FRANKLIN LIFT STATION MISC. IMPROVEMENTS <br />$25,500.00 <br />3. CITY OF SAN MARCOS IMPROVEMENTS <br />FRANKLING LIFT STATION OFFSITE WASTEWATER IMPROVEMENTS TOTAL BID <br />$518,605.00 <br />Page 1 of 1 <br /> <br />