LA CIMA - FRANKLIN LIFT STATION
<br />PID MPA BID - 001A
<br />Bid Opening: December 1, 2016
<br />Rockin Q Construction, LLC
<br />Yes
<br />Bid Bond
<br />Yes
<br />Addendum #1 Acknowledged
<br />1.0 GENERAL CONSTRUCTION
<br />Unit
<br />Bid ItemQuantityDescription Unit PriceAmount
<br />$2,000.00$2,000.00
<br />Traffic Control
<br />1.11LS
<br />$1,200.00$1,200.00
<br />Project Signs
<br />1.21EA
<br />$25,000.00$25,000.00
<br />Mobilization
<br />1.31LS
<br />SUBTOTAL GENERAL
<br />$28,200.00
<br />2.0 FRANKLIN LIFT STATION MISC. IMPROVEMENTS
<br />Unit
<br />Bid ItemQuantityDescription Unit PriceAmount
<br />Remove and Replace Existing Pumps with new 60HP Pumps per Contract
<br />2.1$79,000.00$237,000.00
<br />3EA
<br />Documents, include all associate work, equipment and material for removal, haul
<br />Remove and Replace Existing Guiderails with New SS 316 Guiderails incl. all
<br />2.2$1,100.00$6,600.00
<br />6EA
<br />associate work, equipmenta and material for removal, haul off and disposal per
<br />Remove and Replace Existing Floats with new SS 316 Float Mounting Assembly
<br />2.3$3,500.00$3,500.00
<br />1LS
<br />per contract documents, incl. all associate work, equipment and material for
<br />Remove and Replace Existing discharge pipes from 6-inch DIP to 8-inch DIP per
<br />2.4$80,000.00$80,000.00
<br />1LS
<br />contract documents, incl. combination air release valve, check and gate valves,
<br />2.4$30.00$750.00
<br />25LFFurnish and Install Wood Fence Match Existing per COSM Standards.
<br />2.5$2,500.00$2,500.00
<br />1EAFurnish and Install Wood Fence Gate Match Existing per COSM Standards.
<br />2.6Furnish, install, maintain and remove Silt Fence.$5.00$255.00
<br />51LF
<br />Franklin Lift Station Electrical improvements include pump Control Panel,
<br />2.7$112,300.00$112,300.00
<br />1LS
<br />Electrical Rack, Generator Connection Box, Manual Transfer Switch, Mini-Power
<br />2.8By-pass Pumping required for the wet well lining.$22,000.00$22,000.00
<br />1LS
<br />FRANKLIN LIFT STATION MISC. IMPROVEMENTS
<br />$464,905.00
<br />3.0 CITY OF SAN MARCOS IMPROVEMENTS
<br />Unit
<br />Bid ItemQuantityDescription Unit PriceAmount
<br />Install lining, corrosion resistant, spray or bruch applied material that shall be
<br />$20,000.00$20,000.00
<br />1LS
<br />3.1
<br />urethane, polyurethane or epoxy. 400 Series High Build Epoxy Liner, 80 mils
<br />By-pass Pumping required for the wet well lining.$5,500.00$5,500.00
<br />1LS
<br />3.2
<br />SUBTOTAL CITY OF SAN MARCOS IMPROVEMENTS
<br />$25,500.00
<br />BID SUMMARY
<br />$28,200.00
<br />1. GENERAL CONSTRUCTION
<br />$464,905.00
<br />2. FRANKLIN LIFT STATION MISC. IMPROVEMENTS
<br />$25,500.00
<br />3. CITY OF SAN MARCOS IMPROVEMENTS
<br />FRANKLING LIFT STATION OFFSITE WASTEWATER IMPROVEMENTS TOTAL BID
<br />$518,605.00
<br />Page 1 of 1