Laserfiche WebLink
La Cima <br />Center Point Road Intersection Improvement <br />Engineer's Probable Cost of Construction <br />2/9/2017 <br />1. GENERAL <br />Bid ItemDescription QuantityUnitUnit PriceTotal <br />1Northbound Right Turn Lane with Island <br />$2,925.00 <br />Subgrade Preparation (3' Beyond Back of Curbs-Northbound RTL)1,170SY$2.5 <br />$13,455.00 <br />1,170SY$11.5 <br />12" Flexible Base (Northbound RTL) <br />$9,375.00 <br />2.5" Hot Mix Asphalt (Northbound RTL)750SY$12.5 <br />$15,480.00 <br />860LF$18.0 <br /> Concrete Curb and Gutter (2' Width) <br />$957.50 <br />383SY$2.5 <br />Subgrade Preparation (3' Beyond Back of Curbs Northbound Island) <br />$4,404.50 <br />12" Flexible Base (Northbound RTL near Island)383SY$11.5 <br />$2,687.50 <br />215SY$12.5 <br />2.5" Hot Mix Asphalt (Northbound RTL near Island.) <br />$2,754.00 <br /> Concrete Curb and Gutter (2' Width) 153LF$18.0 <br />$4,637.16 <br /> Reflective Pavement Markings2,342LF$2.0 <br />$240.00 <br /> Reflective Pavement Markings White Arrow2EA$120.0 <br />$300.00 <br /> Reflective Pavement Markings White Word2EA$150.0 <br />$236.00 <br />Raised Pavement Markers59LS$4.0 <br />$808.50 <br />LF <br />24" Reflective Pavement Markings231$3.5 <br />$4,000.00 <br />Remove and Replace Inlets1EA$4,000.0 <br />$4,000.00 <br />1EA$4,000.0 <br />Culvert to be Moved <br />$13,833.00 <br />Pavers1537SF$9.0 <br />$12,000.00 <br />ADA ramps4EA$3,000.0 <br />LS$10,000.00 <br />Traffic Contron per Plan1$10,000.0 <br />$8,005.00 <br />Subgrade Preparation (3' Beyond Back of Curbs-Northbound Acceleration)3,202SY$2.5 <br />$36,823.00 <br />3,202SY$11.5 <br />12" Flexible Base (Northbound Acceleration) <br />$25,825.54 <br />2.5" Hot Mix Asphalt (Northbound Acceleration)2,066SY$12.5 <br />$36,721.87 <br />2,040LF$18.0 <br /> Concrete Curb and Gutter (2' Width) <br />$16,000.00 <br />Remove and Replace Inlets4EA$4,000.0 <br /> Reflective Pavement Markings4,884LF$2.0$9,768.00 <br />Raised Pavement Markers81EA$4.0$325.60 <br />$10,515.39 <br />701SY$15.0 <br />Remove Asphalt <br />$16,074.00 <br />Pavers1786SF$9.0 <br />$6,000.00 <br />ADA ramps2EA$3,000.0 <br />Traffic Control per Plan1$5,000.0$5,000.00 <br />LS <br />SUB TOTAL -1 <br />$273,151.56 <br />2Northbound Left Turn Lane <br /> Reflective Pavement Markings1,500LF$2.0$2,970.00 <br /> Reflective Pavement Markings White Arrow2EA$120.0$240.00 <br /> Reflective Pavement Markings White Word2EA$150.0$300.00 <br />Raised Pavement Markers38EA$4.0$152.00 <br />Remove Concrete Curb1LS$2,000.0$2,000.00 <br />Remove Median1LS$3,000.0$3,000.00 <br />$960.57 <br />384SY$2.5 <br />Subgrade Preparation (2' beyond Removed Median ) <br />$4,418.61 <br />12" Flexible Base (2' beyond Removed Median )384SY$11.5 <br />$3,375.00 <br />270SY$12.5 <br />2.5" Hot Mix Asphalt (2' beyond Removed Median ) <br />LS$3,000.00 <br />Traffic Contron per Plan1$3,000.0 <br />SUB TOTAL -2 <br />$20,416.18 <br />3Southbound Right Turn Lane with Island <br />$2,685.00 <br />1,074SY$2.5 <br />Subgrade Preparation (3' Beyond Back of Curbs-Southbound RTL) <br />$12,351.00 <br />12" Flexible Base (Southbound RTL)1,074SY$11.5 <br />$8,215.41 <br />657SY$12.5 <br />2.5" Hot Mix Asphalt (Southbound RTL) <br />$13,500.00 <br />Concrete Curb and Gutter (2' Width)750LF$18.0 <br />$570.00 <br />Subgrade Preparation (3' Beyond Back of Curbs Suthbound Island)228SY$2.5 <br />$2,622.00 <br />228SY$11.5 <br />12" Flexible Base (Southbound RTL near Island) <br />Page 1 of 3 <br /> <br />