La Cima
<br />Center Point Road Intersection Improvement
<br />Engineer's Probable Cost of Construction
<br />2/9/2017
<br />1. GENERAL
<br />Bid ItemDescription QuantityUnitUnit PriceTotal
<br />1Northbound Right Turn Lane with Island
<br />$2,925.00
<br />Subgrade Preparation (3' Beyond Back of Curbs-Northbound RTL)1,170SY$2.5
<br />$13,455.00
<br />1,170SY$11.5
<br />12" Flexible Base (Northbound RTL)
<br />$9,375.00
<br />2.5" Hot Mix Asphalt (Northbound RTL)750SY$12.5
<br />$15,480.00
<br />860LF$18.0
<br /> Concrete Curb and Gutter (2' Width)
<br />$957.50
<br />383SY$2.5
<br />Subgrade Preparation (3' Beyond Back of Curbs Northbound Island)
<br />$4,404.50
<br />12" Flexible Base (Northbound RTL near Island)383SY$11.5
<br />$2,687.50
<br />215SY$12.5
<br />2.5" Hot Mix Asphalt (Northbound RTL near Island.)
<br />$2,754.00
<br /> Concrete Curb and Gutter (2' Width) 153LF$18.0
<br />$4,637.16
<br /> Reflective Pavement Markings2,342LF$2.0
<br />$240.00
<br /> Reflective Pavement Markings White Arrow2EA$120.0
<br />$300.00
<br /> Reflective Pavement Markings White Word2EA$150.0
<br />$236.00
<br />Raised Pavement Markers59LS$4.0
<br />$808.50
<br />LF
<br />24" Reflective Pavement Markings231$3.5
<br />$4,000.00
<br />Remove and Replace Inlets1EA$4,000.0
<br />$4,000.00
<br />1EA$4,000.0
<br />Culvert to be Moved
<br />$13,833.00
<br />Pavers1537SF$9.0
<br />$12,000.00
<br />ADA ramps4EA$3,000.0
<br />LS$10,000.00
<br />Traffic Contron per Plan1$10,000.0
<br />$8,005.00
<br />Subgrade Preparation (3' Beyond Back of Curbs-Northbound Acceleration)3,202SY$2.5
<br />$36,823.00
<br />3,202SY$11.5
<br />12" Flexible Base (Northbound Acceleration)
<br />$25,825.54
<br />2.5" Hot Mix Asphalt (Northbound Acceleration)2,066SY$12.5
<br />$36,721.87
<br />2,040LF$18.0
<br /> Concrete Curb and Gutter (2' Width)
<br />$16,000.00
<br />Remove and Replace Inlets4EA$4,000.0
<br /> Reflective Pavement Markings4,884LF$2.0$9,768.00
<br />Raised Pavement Markers81EA$4.0$325.60
<br />$10,515.39
<br />701SY$15.0
<br />Remove Asphalt
<br />$16,074.00
<br />Pavers1786SF$9.0
<br />$6,000.00
<br />ADA ramps2EA$3,000.0
<br />Traffic Control per Plan1$5,000.0$5,000.00
<br />LS
<br />SUB TOTAL -1
<br />$273,151.56
<br />2Northbound Left Turn Lane
<br /> Reflective Pavement Markings1,500LF$2.0$2,970.00
<br /> Reflective Pavement Markings White Arrow2EA$120.0$240.00
<br /> Reflective Pavement Markings White Word2EA$150.0$300.00
<br />Raised Pavement Markers38EA$4.0$152.00
<br />Remove Concrete Curb1LS$2,000.0$2,000.00
<br />Remove Median1LS$3,000.0$3,000.00
<br />$960.57
<br />384SY$2.5
<br />Subgrade Preparation (2' beyond Removed Median )
<br />$4,418.61
<br />12" Flexible Base (2' beyond Removed Median )384SY$11.5
<br />$3,375.00
<br />270SY$12.5
<br />2.5" Hot Mix Asphalt (2' beyond Removed Median )
<br />LS$3,000.00
<br />Traffic Contron per Plan1$3,000.0
<br />SUB TOTAL -2
<br />$20,416.18
<br />3Southbound Right Turn Lane with Island
<br />$2,685.00
<br />1,074SY$2.5
<br />Subgrade Preparation (3' Beyond Back of Curbs-Southbound RTL)
<br />$12,351.00
<br />12" Flexible Base (Southbound RTL)1,074SY$11.5
<br />$8,215.41
<br />657SY$12.5
<br />2.5" Hot Mix Asphalt (Southbound RTL)
<br />$13,500.00
<br />Concrete Curb and Gutter (2' Width)750LF$18.0
<br />$570.00
<br />Subgrade Preparation (3' Beyond Back of Curbs Suthbound Island)228SY$2.5
<br />$2,622.00
<br />228SY$11.5
<br />12" Flexible Base (Southbound RTL near Island)
<br />Page 1 of 3
<br />
<br />
|