La Cima
<br />Center Point Road Intersection Improvement
<br />Engineer's Probable Cost of Construction
<br />2/9/2017
<br />$1,825.00
<br />146SY$12.5
<br />2.5" Hot Mix Asphalt (Southbound RTL near Island.)
<br />$2,016.00
<br />112LF$18.0
<br /> Concrete Curb and Gutter (2' Width)
<br />$6,080.58
<br /> Reflective Pavement Markings3,071LF$2.0
<br />$240.00
<br /> Reflective Pavement Markings White Arrow2EA$120.0
<br />$300.00
<br /> Reflective Pavement Markings White Word2EA$150.0
<br />$307.10
<br />Raised Pavement Markers76.775EA$4.0
<br />$16,000.00
<br />Remove and Replace Inlets4EA$4,000.0
<br />$38,000.00
<br />200LF$190.0
<br />Storm RCP
<br />$17,760.00
<br />Headwall2EA$8,880.0
<br />$11,421.00
<br />Pavers1269SF$9.0
<br />$9,000.00
<br />ADA ramps3EA$3,000.0
<br />$10,000.00
<br />LS
<br />1$10,000.0
<br />Traffic Contron per Plan
<br />$3,729.38
<br />1,492SY$2.5
<br />Subgrade Preparation (3' Beyond Back of Curbs Southbound Acceleration)
<br />$17,155.13
<br />12" Flexible Base (Southbound Acceleration)1,492SY$11.5
<br />$11,289.00
<br />903SY$12.5
<br />2.5" Hot Mix Asphalt (Southbound Acceleration )
<br />$19,098.00
<br /> Concrete Curb and Gutter (2' Width) 1,061LF$18.0
<br />$4,805.46
<br />$2.0
<br /> Reflective Pavement Markings2,427LF
<br />$242.70
<br />Raised Pavement Markers60.675EA$4.0
<br />$12,000.00
<br />$4,000.0
<br />Remove and Replace Inlets3EA
<br />$4,000.00
<br />Culvert to be Moved1EA$4,000.0
<br />$34,500.00
<br />$150.0
<br />Remove and Replace Guardal230LF
<br />LS$5,000.00
<br />Traffic Contron per Plan1$5,000.0
<br />SUB TOTAL -3
<br />$264,712.75
<br />4Southbound Left Turn Lane
<br /> Reflective Pavement Markings1,256LF$2.0$2,486.88
<br /> Reflective Pavement Markings White Arrow2EA$120.0$240.00
<br /> Reflective Pavement Markings White Word2EA$150.0$300.00
<br />Raised Pavement Markers31.4EA$4.0$125.60
<br /> Remove Reflective Pavement Markings321LF$1.5$481.50
<br />Traffic Contron per Plan1$3,000.0$3,000.00
<br />LS
<br />SUB TOTAL -4
<br />$6,633.98
<br />5Westbound Approach
<br />$3,622.50
<br />1,449SY$2.5
<br />Subgrade Preparation (3' Beyond Back of Curbs-Westbound Left)
<br />$16,663.50
<br />12" Flexible Base (Westbound Left)1,449SY$11.5
<br />$14,347.01
<br />1,148SY$12.5
<br />2.5" Hot Mix Asphalt (Westbound Left)
<br />$9,378.00
<br /> Concrete Curb and Gutter (2' Width) 521LF$18.0
<br />$3,280.86
<br />$2.0
<br /> Reflective Pavement Markings1,657LF
<br />$110.47
<br />Raised Pavement Markers28LS$4.0
<br />$4,000.00
<br />$4,000.0
<br />Remove and Replace Inlets1EA
<br />LS$5,000.00
<br />Traffic Contron per Plan1$5,000.0
<br />SUB TOTAL -5
<br />$56,402.34
<br />6
<br />Eastbound Approach
<br />$3,130.37
<br />1,252SY$2.5
<br />Subgrade Preparation (3' Beyond Back of Curbs Eastbound)
<br />$14,399.71
<br />12" Flexible Base (Eastbound)1,252SY$11.5
<br />$10,381.00
<br />830SY$12.5
<br />2.5" Hot Mix Asphalt (Eastbound )
<br />$26,406.00
<br /> Concrete Curb and Gutter (2' Width) 1,467LF$18.0
<br />$5,868.00
<br />$4.0
<br /> Reflective Pavement Markings1,467LF
<br />$720.00
<br /> Reflective Pavement Markings White Arrow6EA$120.0
<br />$750.00
<br />$150.0
<br /> Reflective Pavement Markings White Word5EA
<br />$148.00
<br />Raised Pavement Markers37EA$4.0
<br />$0.00
<br />$965.00
<br />Subgrade Preparation (3' Beyond Back of Curbs Eastbound Island)386SY$2.5
<br />$4,439.00
<br />386SY$11.5
<br />12" Flexible Base (Eastbound RTL near Island)
<br />$2,675.00
<br />2.5" Hot Mix Asphalt (Eastbound RTL near Island)214SY$12.5
<br />Page 2 of 3
<br />
<br />
|