Laserfiche WebLink
La Cima <br />Center Point Road Intersection Improvement <br />Engineer's Probable Cost of Construction <br />2/9/2017 <br />$1,825.00 <br />146SY$12.5 <br />2.5" Hot Mix Asphalt (Southbound RTL near Island.) <br />$2,016.00 <br />112LF$18.0 <br /> Concrete Curb and Gutter (2' Width) <br />$6,080.58 <br /> Reflective Pavement Markings3,071LF$2.0 <br />$240.00 <br /> Reflective Pavement Markings White Arrow2EA$120.0 <br />$300.00 <br /> Reflective Pavement Markings White Word2EA$150.0 <br />$307.10 <br />Raised Pavement Markers76.775EA$4.0 <br />$16,000.00 <br />Remove and Replace Inlets4EA$4,000.0 <br />$38,000.00 <br />200LF$190.0 <br />Storm RCP <br />$17,760.00 <br />Headwall2EA$8,880.0 <br />$11,421.00 <br />Pavers1269SF$9.0 <br />$9,000.00 <br />ADA ramps3EA$3,000.0 <br />$10,000.00 <br />LS <br />1$10,000.0 <br />Traffic Contron per Plan <br />$3,729.38 <br />1,492SY$2.5 <br />Subgrade Preparation (3' Beyond Back of Curbs Southbound Acceleration) <br />$17,155.13 <br />12" Flexible Base (Southbound Acceleration)1,492SY$11.5 <br />$11,289.00 <br />903SY$12.5 <br />2.5" Hot Mix Asphalt (Southbound Acceleration ) <br />$19,098.00 <br /> Concrete Curb and Gutter (2' Width) 1,061LF$18.0 <br />$4,805.46 <br />$2.0 <br /> Reflective Pavement Markings2,427LF <br />$242.70 <br />Raised Pavement Markers60.675EA$4.0 <br />$12,000.00 <br />$4,000.0 <br />Remove and Replace Inlets3EA <br />$4,000.00 <br />Culvert to be Moved1EA$4,000.0 <br />$34,500.00 <br />$150.0 <br />Remove and Replace Guardal230LF <br />LS$5,000.00 <br />Traffic Contron per Plan1$5,000.0 <br />SUB TOTAL -3 <br />$264,712.75 <br />4Southbound Left Turn Lane <br /> Reflective Pavement Markings1,256LF$2.0$2,486.88 <br /> Reflective Pavement Markings White Arrow2EA$120.0$240.00 <br /> Reflective Pavement Markings White Word2EA$150.0$300.00 <br />Raised Pavement Markers31.4EA$4.0$125.60 <br /> Remove Reflective Pavement Markings321LF$1.5$481.50 <br />Traffic Contron per Plan1$3,000.0$3,000.00 <br />LS <br />SUB TOTAL -4 <br />$6,633.98 <br />5Westbound Approach <br />$3,622.50 <br />1,449SY$2.5 <br />Subgrade Preparation (3' Beyond Back of Curbs-Westbound Left) <br />$16,663.50 <br />12" Flexible Base (Westbound Left)1,449SY$11.5 <br />$14,347.01 <br />1,148SY$12.5 <br />2.5" Hot Mix Asphalt (Westbound Left) <br />$9,378.00 <br /> Concrete Curb and Gutter (2' Width) 521LF$18.0 <br />$3,280.86 <br />$2.0 <br /> Reflective Pavement Markings1,657LF <br />$110.47 <br />Raised Pavement Markers28LS$4.0 <br />$4,000.00 <br />$4,000.0 <br />Remove and Replace Inlets1EA <br />LS$5,000.00 <br />Traffic Contron per Plan1$5,000.0 <br />SUB TOTAL -5 <br />$56,402.34 <br />6 <br />Eastbound Approach <br />$3,130.37 <br />1,252SY$2.5 <br />Subgrade Preparation (3' Beyond Back of Curbs Eastbound) <br />$14,399.71 <br />12" Flexible Base (Eastbound)1,252SY$11.5 <br />$10,381.00 <br />830SY$12.5 <br />2.5" Hot Mix Asphalt (Eastbound ) <br />$26,406.00 <br /> Concrete Curb and Gutter (2' Width) 1,467LF$18.0 <br />$5,868.00 <br />$4.0 <br /> Reflective Pavement Markings1,467LF <br />$720.00 <br /> Reflective Pavement Markings White Arrow6EA$120.0 <br />$750.00 <br />$150.0 <br /> Reflective Pavement Markings White Word5EA <br />$148.00 <br />Raised Pavement Markers37EA$4.0 <br />$0.00 <br />$965.00 <br />Subgrade Preparation (3' Beyond Back of Curbs Eastbound Island)386SY$2.5 <br />$4,439.00 <br />386SY$11.5 <br />12" Flexible Base (Eastbound RTL near Island) <br />$2,675.00 <br />2.5" Hot Mix Asphalt (Eastbound RTL near Island)214SY$12.5 <br />Page 2 of 3 <br /> <br />