Laserfiche WebLink
La Cima <br />Center Point Road Intersection Improvement <br />Engineer's Probable Cost of Construction <br />2/9/2017 <br />$2,646.00 <br />147LF$18.0 <br /> Concrete Curb and Gutter (2' Width) <br />$4,000.00 <br />$4,000.0 <br /> Remove and Replace Inlets 1EA <br />$9,540.00 <br />Pavers1060SF$9.0 <br />$9,000.00 <br />ADA ramps3EA$3,000.0 <br />LS$10,000.00 <br />Traffic Contron per Plan1$10,000.0 <br />SUB TOTAL -6 <br />$105,068.08 <br />$200,000.00 <br />7Signal Construction 1LS$200,000.00 <br />$926,384.90 <br />TOTAL <br />$46,319.24 <br />5% Mobilization <br />Payment performance bond $23,159.62 <br />Maintanence Bond$2,315.96 <br />TOTAL CONSTRUCTION COST$998,179.73 <br />$99,817.97 <br />10% Contingency <br />TOTAL CONSTRUCTION COST WITH CONTINGENCY$1,097,997.70 <br />Page 3 of 3 <br /> <br />