Laserfiche WebLink
City of San Marcos Total$172,085.49$0.00$0.00$4,179.41$35,533.47$0.00$126,000.00$337,798.37 <br />2/9/2017 <br />$363,977.74$400,375.51 <br />$16,889.92$36,397.77 <br />$8,444.96 <br />$844.50 <br />$101,066.08$20,416.18$264,712.75$2,454.57$20,868.86$105,068.08$74,000.00 <br />$588,586.53 <br />Developer Total <br />$634,201.99$697,622.19 <br />$29,429.33$14,714.66$63,420.20 <br />$1,471.47 <br />City of San Marcos % <br />63%63%63%63% <br />0%0%0% <br />Engineer's Probable Cost of Construction <br />Centerpoint Intersection Improvements <br />Developer % <br />100%100%100% <br />37%37%37%37% <br />La Cima <br />$273,151.56$20,416.18$264,712.75$6,633.98$56,402.34$105,068.08$200,000.00 <br />$1,097,997.70 <br />$998,179.73 <br />$926,384.90 <br />$46,319.24$23,159.62$99,817.97 <br />Total Cost <br />$2,315.96 <br />Total Construction Cost <br />TOTAL CONSTRUCTION COST WITH CONTINGENCY <br />Payment performance bond <br />TOTAL CONSTRUCTION COST <br />Maintanence Bond <br />10% Contingency <br />5% Mobilization <br />Description <br />Northbound Right Turn Lane with IslandSouthbound Right Turn Lane with Island <br />Northbound Left Turn Lane <br />Southbound Left Turn Lane <br />Westbound Approach <br />Eastbound Approach <br />Signal Construction <br />Bid Item <br />1.02.03.04.05.06.07.0 <br /> <br />