My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2017-054/awarding a design contract for the provision of Sessom Drainage Improvements preliminary engineering, design engineering, bid and construction phase services to American Structurepoint Inc., in the estimated amount of $228,395.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2017
>
Res 2017-054/awarding a design contract for the provision of Sessom Drainage Improvements preliminary engineering, design engineering, bid and construction phase services to American Structurepoint Inc., in the estimated amount of $228,395.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:03:06 AM
Creation date
4/26/2017 11:58:59 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2017-54
Date
4/4/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT A: SCOPE OF SERVICES <br /> CITY OF SAN MARCOS <br /> SESSOM DRAINAGE IMPROVEMENTS AT ACADEMY PS&E <br /> Project Understanding <br /> The work to be performed by The ENGINEER,under this contract will consist of providing Preliminary <br /> Engineering(30%),Design Engineering(60%/90%/100%),Bid,Construction,and Record Drawing Phase Services. <br /> The project consists of the following improvements: <br /> • Drainage design along Academy St.and Sessom Dr.from Orchard St.to the outfall on Texas State <br /> University property near Alamo St. <br /> • Final design will implement drainage alternate as previously determined by the CITY. (Alternate 4) <br /> • In general,consisting of abandoning the existing 12-inch pipe between Orchard St.and Sessom Dr.,and <br /> placing a 36-inch main trunkline along the south edge curb line along Academy St.and Sessom Dr. <br /> • Upsizing the existing 6-inch waterline along Academy to 12-inches from Orchard St.to Sessom Dr.,and <br /> relocating the existing 12-inch waterline in Sessom Dr.as required for the drainage improvements. <br /> • Upsizing the existing wastewater line from 6-inches to 8-inches along Academy St.from Orchard St.to <br /> Sessom Dr.,and relocating the existing 8-inch wastewater line in Sessom Dr.as required for the drainage <br /> improvements. <br /> • Traffic Signal Warrant Study and Traffic Signal Plans at the Sessom Dr.&Academy St. intersection. <br /> • Pedestrian signals and revised pavement markings at the Sessom Dr.&Academy St. intersection. <br /> I. Preliminary Phase(30%) <br /> A. Project Management and QA/QC:This task includes routine communication with the OWNER; <br /> managing subconsultants,manpower,budgets,and schedules;invoicing; implementing and monitoring <br /> of QA/QC efforts;and other activities associated with managing the project. <br /> i. Project Management <br /> ii. QA/QC <br /> B. Meetings:The ENGINEER will prepare meeting minutes and letter responses to questions as need. <br /> i. Project Meeting:The ENGINEER will prepare for and attend one(1)kickoff meeting on site <br /> with the OWNER and sub-consultants to initiate the project. <br /> C. Field Investigations <br /> i. Topographic and Tree Survey: Develop map with visible improvements,visible utilities,one- <br /> foot contours,spot elevations,trees 4"diameter and larger,utility pipe sizes and flowlines <br /> when possible.This will include coordinating with and locating One-Call markings for the <br /> site. <br /> ii. Boundary Surveying:Establish the right-of-way lines of Sessom Dr.,Academy St.,Orchard <br /> St.,and Alamo St.together with the side lines and rear lines.The survey will show the <br /> boundary and easement information. Boundary corners will be found and verified,and any <br /> material discrepancies will be reported. <br /> iii. SUE—Up to 5 Sue borings will be performed. <br /> D. Pipelines—Water/Sanitary Sewer <br /> i. Identify potential conflicts between water and sanitary sewer utilities and preliminary <br /> engineering for replacement using topographic survey information and available utility <br /> records. <br /> ii. Prepare necessary plan sheets for bidding(plan and profile of main relocations,plan view of <br /> abandonment detail,bypass pumping and shut-out detail,water and wastewater detail sheets) <br /> E. Drainage <br /> i. Watershed Analysis—The ENGINEER will delineate drainage areas and determine <br /> hydrology based on the rational method or other method as appropriate based on the size of <br /> Page 1 of 4 <br />