Laserfiche WebLink
F. Final Pay Estimate Review <br /> G. Review Change Orders <br /> H. Project Startup <br /> I. Substantial and Final Completion/Utility Certifications <br /> V. Record Drawing Phase <br /> A. Deliverables(must follow COSM CADD standards) <br /> i. Draft Drawings:Provide one(1)hardcopy of 22"x34"plan set,one(1)PDF electronic copy <br /> of 11"x17"plan set,one(1)CAD copy.Drawings will be based on information provided by <br /> the contractor and COSM. <br /> ii. Final Drawings <br /> Exclusions <br /> A. The following services are not included in the scope: <br /> a. Traffic counts <br /> b. Cross-section alternatives <br /> c. LID/water quality <br /> d. ROW acquisition <br /> e. Construction inspection <br /> I TCEQ Coordination not required in the Edwards Transition Zone <br /> g. Site visit reports and shop drawing submittal log not required.Owner Insite system will be used. <br /> Page 4 of 4 <br />