Laserfiche WebLink
PROFESSIONAL ENGINEERING SERVICES AGREEMENT <br /> Contract Number: 217-262 <br /> This Agreement is effective March 21, 2017 between the City of San Marcos, Texas, a <br /> home-rule municipal corporation, (the "City"), 630 East Hopkins, San Marcos, Texas 78666 and <br /> American Structurepoint, Inc. (the "Engineer"), 1717 W 6th Street, Suite 375, Austin TX 78703, <br /> for the Engineer's provision of engineering services in connection with the Sessom Drainage <br /> Improvements at Academy Project(the "Project"). <br /> The City and the Engineer agree as follows: <br /> ARTICLE 1 <br /> ENGINEER'S SERVICES AND STANDARD OF PERFORMANCE <br /> A. The term of this Agreement begins on the effective date established above and will end <br /> upon the Engineer's completion, and the City's acceptance of all services included in this <br /> Agreement. The Engineer agrees to provide the City with the services described in Attachment A, <br /> Scope of Services, which is incorporated herein by reference for all intents and purposes. The <br /> services for this Project are more generally described as the provision of preliminary engineering <br /> (30%), design engineering (60%/90%/100%), bid assistance and construction and record drawing <br /> phase services. The project scope includes: <br /> 1) Drainage design along Academy Street and Sessom Drive from Orchard Street to the <br /> outfall on Texas State University property near Alamo Street. Final design will include a <br /> drainage alternate as previously determined by the City. <br /> 2) The abandonment of the existing 12-inch pipe between Orchard Street and Sessom Drive, <br /> and the placement of a 36-inch main trunk line along the south edge curb line along <br /> Academy Street and Sessom Drive. <br /> 3) Upsizing the existing 6-inch waterline along Academy Street to 12-inches from Orchard <br /> Street to Sessom Drive and relocating the existing 12-inch waterline in Sessom Drive as <br /> required for the drainage improvements. <br /> 4) Upsizing the existing wastewater line from 6-inches to 8-inches along Academy Street <br /> from Orchard Street to Sessom Drive, and relocating the existing 8-inch wastewater line in <br /> Sessom Drive as required for the drainage improvements. <br /> 5) Traffic Signal Warrant Study and Traffic Signal Plans at the Sessom Drive and Academy <br /> Street intersection. <br /> 6) Pedestrian signals and revised pavement markings at the Sessom Drive and Academy <br /> Street intersection. <br /> B. The Engineer understands and agrees to provide all design work and professional services <br /> in the most expedient and efficient manner possible in order to complete the Project by August 20, <br /> 2019 in accordance with the approved Project Schedule included in this Agreement as Attachment <br /> C. <br /> 1 <br />