Laserfiche WebLink
BIDDING PHASE <br /> • Not included at this time. <br /> CONSTRUCTION PHASE <br /> • Not included at this time. <br /> RECORD DRAWINGS PHASE <br /> • Not included at this time. <br /> SUPPLEMENTAL SERVICES <br /> A. Subsurface Utility Engineering(SUE)Locates. SUE Locates are not requested for this project. <br /> B. Geotechnical Investigation. A geotechnical investigation is not requested for this project. <br /> C. Easement Field Notes. This task shall include preparation of easement field notes. The number of <br /> easements required is unknown;the budget included is based on an estimate of four(4)easements. <br /> CITY RESPONSIBILITES/ASSUMPTIONS IN SCOPE PREPARATION <br /> • City will give prompt notice of any development or other activities that would affect the scope or <br /> schedule of the scope of work. <br /> • City will field and document questions during the bidding phase and route technical questions <br /> regarding the design to APAI. City will distribute Addenda. <br /> • City will draft and route Change Orders. <br /> • The cultural resources scope includes a desktop review/analysis and letter report; any required <br /> follow-up field investigations, agency coordination/permit preparation, and archeological surveys <br /> are not included in the scope of services and can be provided as additional services. <br /> • Karst investigations and surveys are not included in the scope of services. <br /> • Trench restoration will consist of restoration to pre-existing conditions. <br /> • Construction Phase Services were based on an estimated construction duration of 2 months. <br /> • Schedule is contingent on right-of-entry to private property for surveying and site visits. <br /> • City will handle public relations and communications with property owners. <br /> A-3 <br />