My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2017-071/approving an agreement with Alan Plummer Associates, Inc. for the provision of professional engineering services in connection with the Primrose Way Water Project in the not-to-exceed amount of $69,978.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2017
>
Res 2017-071/approving an agreement with Alan Plummer Associates, Inc. for the provision of professional engineering services in connection with the Primrose Way Water Project in the not-to-exceed amount of $69,978.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 11:31:37 AM
Creation date
5/3/2017 4:08:58 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2017-71
Date
4/18/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BIDDING PHASE <br /> • Not included at this time. <br /> CONSTRUCTION PHASE <br /> • Not included at this time. <br /> RECORD DRAWINGS PHASE <br /> • Not included at this time. <br /> SUPPLEMENTAL SERVICES <br /> A. Subsurface Utility Engineering(SUE)Locates. SUE Locates are not requested for this project. <br /> B. Geotechnical Investigation. A geotechnical investigation is not requested for this project. <br /> C. Easement Field Notes. This task shall include preparation of easement field notes. The number of <br /> easements required is unknown;the budget included is based on an estimate of four(4)easements. <br /> CITY RESPONSIBILITES/ASSUMPTIONS IN SCOPE PREPARATION <br /> • City will give prompt notice of any development or other activities that would affect the scope or <br /> schedule of the scope of work. <br /> • City will field and document questions during the bidding phase and route technical questions <br /> regarding the design to APAI. City will distribute Addenda. <br /> • City will draft and route Change Orders. <br /> • The cultural resources scope includes a desktop review/analysis and letter report; any required <br /> follow-up field investigations, agency coordination/permit preparation, and archeological surveys <br /> are not included in the scope of services and can be provided as additional services. <br /> • Karst investigations and surveys are not included in the scope of services. <br /> • Trench restoration will consist of restoration to pre-existing conditions. <br /> • Construction Phase Services were based on an estimated construction duration of 2 months. <br /> • Schedule is contingent on right-of-entry to private property for surveying and site visits. <br /> • City will handle public relations and communications with property owners. <br /> A-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.