Laserfiche WebLink
project schedule, and permitting and environmental considerations along with at schematic figure. <br /> APAI will address City comments and revise memo as requested by City. Deliverables include a <br /> draft memo(3 hard copies, 1 PDF)and final memo(3 hard copies, 1 PDF, 1 DWG). <br /> DESIGN PHASE <br /> • Meetings. Includes one (1) Review Meetings at 90% and one (1) site visit. Public meetings, <br /> preparation of exhibits,and utility coordination meetings are not included. <br /> • Prepare Drawings, including: <br /> 1. Cover Sheet <br /> 2. General Notes Sheets <br /> 3. Overall layout plan showing sheet index <br /> 4. Water Line Plan Sheets(1,880 LF). <br /> 5. Traffic Control Plan Sheets consisting of Standard Details(Detailed Project Specific Sheets <br /> are not included). <br /> 6. Erosion and Sedimentation Control plan prepared with TxDOT template Stormwater <br /> Pollution Prevention Plan (SWPPP) sheets and Environmental Permits, Issues, and <br /> Commitments(EPIC) Sheets <br /> 7. Standard Water Details, COA Traffic Control Details, and Standard Erosion Control <br /> Standard Details <br /> • Prepare Quantity Breakdowns by Sheet and OPCC. Quantity Table by sheet to be included on the <br /> 90%submittal. <br /> • Prepare Bid Form and Specifications <br /> • Update Project Schedule and Prepare Construction Schedule <br /> Design Phase Submittal Deliverables will include: <br /> A. 60%Submittal Not requested for this project. <br /> B. 90%Submittal (4-11"x17" Sets, 1 PDF)(1"=40'H& 1"=10'V) <br /> 1. Plan Set(Include items from 60%submittal) <br /> a. Cover Sheet <br /> b. Project Layout Sheet <br /> c. Plan Sheets(Profile is not required for water lines less than 12-inches in diameter) <br /> d. Details <br /> e. Quantities—Broken down by sheet <br /> f. OPCC-broken down by sheet <br /> g. Specifications <br /> i. Index of Specs <br /> ii. Modifications to Austin Specs <br /> iii. COSM Adopted Specs-Project Specific <br /> iv. Special Specifications <br /> 2. OPCC <br /> 3. Bid Form <br /> 4. Construction Schedule <br /> C. 99%Submittal (4-11"x17" Sets, 1 PDF) <br /> 1. Plan Set(include items from 90%submittal) <br /> a. Unsealed plans with all comments addressed <br /> D. 100%Submittal Sealed (2- 11"x17" Sets, 1 PDF, 1 CAD) <br /> 1. Sealed Plan Set(include all items from 90%, and 99%submittal) <br /> 2. Construction Check List(1 PDF) <br /> 3. Bid Form(Word version) <br /> 4. Technical Specifications(1 PDF) <br /> A-2 <br />