My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2017-071/approving an agreement with Alan Plummer Associates, Inc. for the provision of professional engineering services in connection with the Primrose Way Water Project in the not-to-exceed amount of $69,978.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2017
>
Res 2017-071/approving an agreement with Alan Plummer Associates, Inc. for the provision of professional engineering services in connection with the Primrose Way Water Project in the not-to-exceed amount of $69,978.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2017 11:31:37 AM
Creation date
5/3/2017 4:08:58 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2017-71
Date
4/18/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROFESSIONAL ENGINEERING SERVICES AGREEMENT <br /> Contract Number: 217-196 <br /> This Agreement is effective January 31, 2017 between the City of San Marcos, Texas, a <br /> home-rule municipal corporation, (the "City"), 630 East Hopkins, San Marcos, Texas 78666 and <br /> Alan Plummer Associates, Inc. (the "Engineer"), 6300 La Calma, Suite 400, Austin, TX 78752, <br /> for the Engineer's provision of engineering services in connection with the Primrose Way Water <br /> Project(the"Project"). <br /> The City and the Engineer agree as follows: <br /> ARTICLE 1 <br /> ENGINEER'S SERVICES AND STANDARD OF PERFORMANCE <br /> A. The term of this Agreement begins on the effective date established above and will end <br /> upon the Engineer's completion, and the City's acceptance of all services included in this <br /> Agreement. The Engineer agrees to provide the City with the services described in Attachment A, <br /> Scope of Services, which is incorporated herein by reference for all intents and purposes. The <br /> services for this Project are more generally described as the provision of preliminary engineering <br /> and final design phase services for the construction of approximately 1,880 linear feet of 8-inch <br /> water line. <br /> B. The Engineer understands that time is of the essence and agrees to provide all design work <br /> and professional services in the most expedient and efficient manner possible in order to complete <br /> the Project by September 30, 2019 in accordance with the approved Project Schedule included in <br /> this Agreement as Attachment C. <br /> C. The Engineer will not subcontract any work under this Agreement without prior written <br /> approval from the City. In the event approval is given by the City, the Engineer will specify the <br /> appropriate insurance requirements and miscellaneous provisions by separate written agreement <br /> with the subcontractor. <br /> D. The Engineer will perform all of its services in coordination with the City. The Engineer <br /> will advise the City of data and information the Engineer needs to perform its services and the <br /> Engineer will meet with City representatives at mutually convenient times to assemble this data <br /> and information. <br /> E. Maridel Jimenez, P.E. is the Engineer's Project Representative assigned to this Project. <br /> The Engineer will not substitute another representative for this Project unless approved in writing <br /> by the City in advance of such proposed substitution. In the event the City and the Engineer cannot <br /> agree to the substitution of the Project Representative,the City may terminate this agreement. <br /> F. The City will designate and notify the Engineer of its designation of an authorized Project <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.