My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2017-121/approving a Professional Services Agreement with Kimley-Horn And Associates, Inc. for the provision of Engineering Services in connection with the Sessom Creek Wastewater Improvements Project from N. LBJ to Canyon Road
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2017
>
Res 2017-121/approving a Professional Services Agreement with Kimley-Horn And Associates, Inc. for the provision of Engineering Services in connection with the Sessom Creek Wastewater Improvements Project from N. LBJ to Canyon Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2017 9:13:01 AM
Creation date
8/24/2017 10:19:53 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2017-121
Date
8/15/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT A <br /> CITY OF SAN MARCOS <br /> SESSOM DRIVE WASTEWATER REPLACEMENT FROM N. LBJ TO CANYON ROAD <br /> SCOPE OF SERVICES <br /> viii. Erosion Control Plan and Details <br /> ix. Traffic Control Standard Details <br /> x. Engineer's OPCC. <br /> xi. Construction Project Schedule: KIMLEY-HORN will develop a Construction <br /> Schedule for the project consisting of design, bid and construction phases. The <br /> schedule will be updated during design. <br /> g. 99% Comment Response Letter. <br /> h. Final 100%: KIMLEY-HORN will provide two (2) hard copies of 11"x 17" plan sets and <br /> one (1) pdf electronic copy. Upon approval by the City, two (2) hard copies of 11" x 17" <br /> plan sets, one (1) pdf copy, and one (1) CAD copy of the sealed plans will be provided. <br /> The 100% documents will incorporate the plans and specifications provided by John <br /> Gleason, LLC to provide a complete set of contract documents for bidding purposes. <br /> Phase C— Bid Phase <br /> 1. Project Management: This task consists of routine communication with the City and other <br /> activities associated with managing the project. <br /> 2. Attend Pre-Bid Meeting: KIMLEY-HORN will assist the City in conducting pre-bid meeting and <br /> developing the agenda. <br /> 3. Answer Questions: KIMLEY-HORN will coordinate with the City for issuing responses for <br /> technical questions and requests for additional information from potential bidders. <br /> 4. Addenda: KIMLEY-HORN will prepare addenda required to clarify, correct or change the bid <br /> documents. Addenda will be provided in Adobe .pdf (searchable) format and sealed by <br /> responsible engineer(s). Addenda will be issued to bidders through the City's Purchasing <br /> Department. <br /> 5. Bid Tabulation and Recommendation of Award: KIMLEY-HORN will assist the City in opening of <br /> bids, review all bids and evaluate them for responsiveness and bid amount. KIMLEY-HORN will <br /> also check references, by telephone, of the low bidder and second low bidder. KIMLEY-HORN <br /> will prepare a letter summarizing the review and evaluation and include recommendations for <br /> award of the contract for construction, or other action as may be appropriate. The City will make <br /> the final decision on the award of the contract for construction and the acceptance or rejection of <br /> all bids. <br /> 6. Deliverables: KIMLEY-HORN will incorporate addenda items in the Construction Plans; include <br /> addenda in the bound Project Manual; and issue a "Conformed" set of plans for construction. <br /> a. Bid Form: KIMLEY-HORN will provide the Bid Form in Word Document format. <br /> b. Technical Specifications: KIMLEY-HORN will provide one (1) pdf electronic copy of the <br /> Technical Specifications. <br /> c. Conformed Plans: KIMLEY-HORN will provide one (1) electronic copy of Construction <br /> Plans in pdf, one (1) CAD copy, and two (2) 22" x 34" plan set, three (3) 11"x 17" plan <br /> sets. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.