My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2017-121/approving a Professional Services Agreement with Kimley-Horn And Associates, Inc. for the provision of Engineering Services in connection with the Sessom Creek Wastewater Improvements Project from N. LBJ to Canyon Road
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2017
>
Res 2017-121/approving a Professional Services Agreement with Kimley-Horn And Associates, Inc. for the provision of Engineering Services in connection with the Sessom Creek Wastewater Improvements Project from N. LBJ to Canyon Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2017 9:13:01 AM
Creation date
8/24/2017 10:19:53 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2017-121
Date
8/15/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT A <br /> CITY OF SAN MARCOS <br /> SESSOM DRIVE WASTEWATER REPLACEMENT FROM N. LBJ TO CANYON ROAD <br /> SCOPE OF SERVICES <br /> d. 90%: KIMLEY-HORN will provide two (2) hard copies of 11"x 17" plan sets and one (1) <br /> pdf electronic copy. The plan set will also contain the following: <br /> i. Cover Sheet <br /> ii. General Notes <br /> iii. Project Layout Sheet: KIMLEY-HORN will provide a layout of the project with <br /> plan sheet references. <br /> iv. Overall Quantity Sheet: KIMLEY-HORN will provide a quantity table that includes <br /> individual sheet quantities and the overall project quantities. <br /> v. Wastewater Line Plan and Profile Sheets: Estimated Number of Sheet—six (6). <br /> Five(5) main sheets and one (1) connection sheet. <br /> vi. Water Line Plan and Profile Sheets: Estimated Number of Sheets—two (2). <br /> vii. Detail Sheets <br /> viii. Erosion Control Plan and Details <br /> ix. Traffic Control Standard Details <br /> x. Engineer's OPCC. <br /> xi. Construction Project Schedule: KIMLEY-HORN will develop a Construction <br /> Schedule for the project consisting of design, bid and construction phases. The <br /> schedule will be updated during design. <br /> e. 90% Comment Response Letter. <br /> f. 99%: KIMLEY-HORN will provide two (2) hard copies of 11"x 17" plan sets and one (1) <br /> pdf electronic copy. The plan set will also contain the following: <br /> i. Cover Sheet <br /> ii. General Notes <br /> iii. Project Layout Sheet: KIMLEY-HORN will provide a layout of the project with <br /> plan sheet references. <br /> iv. Overall Quantity Sheet: KIMLEY-HORN will provide a quantity table that includes <br /> individual sheet quantities and the overall project quantities. <br /> v. Wastewater Line Plan and Profile Sheets: Estimated Number of Sheet—six (6). <br /> Five(5) main sheets and one (1) connection sheet. <br /> vi. Water Line Plan and Profile Sheets: Estimated Number of Sheets—two (2). <br /> vii. Detail Sheets <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.