Laserfiche WebLink
ATTACHMENT A <br /> CITY OF SAN MARCOS <br /> SESSOM DRIVE WASTEWATER REPLACEMENT FROM N. LBJ TO CANYON ROAD <br /> SCOPE OF SERVICES <br /> i. TCEQ: KIMLEY-HORN will notify TCEQ at project milestones as required by <br /> TCEQ. <br /> f. Joint Project Coordination: Kimley-Horn will coordinate with John Gleason, LLC regarding <br /> the Sessom Creek Bank Stabilization Project. The coordination will consist of file and <br /> data sharing, survey review and comments, plan and specification incorporation and <br /> review, and additional coordination as required to complete the project. <br /> 4. Deliverables: <br /> a. Monthly Status Report: KIMLEY-HORN will provide a monthly status report, including a <br /> brief summary of work completed as well as a status plan set. <br /> b. 60%: KIMLEY-HORN will provide two (2) hard copies of 11"x 17" plan sets and one (1) <br /> pdf electronic copy. At a minimum, the plan set will contain the following: <br /> i. Cover Sheet <br /> ii. General Notes <br /> iii. Project Layout Sheet: KIMLEY-HORN will provide a layout of the project with <br /> plan sheet references. <br /> iv. Overall Quantity Sheet: KIMLEY-HORN will provide a quantity table that includes <br /> individual sheet quantities and the overall project quantities. <br /> v. Wastewater Line Plan and Profile Sheets: Estimated Number of Sheet—six (6). <br /> Five(5) main sheets and one (1) connection sheet. <br /> vi. Water Line Plan and Profile Sheets: Estimated Number of Sheets—two (2). <br /> vii. List of Standard Details: City of San Marcos details will be used where available. <br /> City of Austin details will be used otherwise. <br /> viii. List of Standard Specifications: City of San Marcos Division 1 specifications will <br /> be used. City of Austin standard specifications will be used. <br /> ix. Project Specific/Special Specifications <br /> x. Project Specific/Special Details <br /> xi. Engineer's Opinion of Probable Construction Costs (OPCC). <br /> xii. Construction Project Schedule: KIMLEY-HORN will develop a Construction <br /> Schedule for the project consisting of design, bid and construction phases. The <br /> schedule will be updated during design. <br /> c. 60% Comment Response Letter. <br /> 3 <br />