ATTACHMENT A <br /> CITY OF SAN MARCOS <br /> SESSOM DRIVE WASTEWATER REPLACEMENT FROM N. LBJ TO CANYON ROAD <br /> SCOPE OF SERVICES <br /> (Exhibit A) provided by the City, for the purpose of preparing Design Documents. KIMLEY- <br /> HORN will prepare an electronic map showing the following: <br /> a. 200-foot cross-section along Sessom Creek. (Approximately 4 cross-sections). <br /> b. Streets, pavement and associated infrastructure along the 200-foot cross-sections. <br /> c. Existing trees, size and type (at minimum caliper inches required by City CIP) —24" <br /> and above caliper for Native Oaks, Elms, Madrone, and Pecan, Celtis Occidentalis <br /> (Hackberry), Juniperus Virginiana, Juniperus Ashei (Common Cedar), Chinaberry, <br /> mesquite and Ligustrum trees per San Marcos City Ordinances, Section 5.5.2.2- <br /> (g)(2). <br /> d. Shot at top of nut of water and gas valves. Water, Sewer, and Drainage maps will be <br /> required to be provided by City prior to survey. <br /> e. Identify all visible and above grade utilities, and manholes with invert elevations and <br /> tied to existing control points/ City bench marks (if any). Underground site utilities will <br /> be located by Dig-Tess only. <br /> f. Full topography at the Canyon Fork intersection, 150 feet along each leg of the <br /> roadway. Four 50-foot cross-sections at the upstream face, downstream face, and at <br /> 50 feet upstream and downstream of the crossing. <br /> g. Locate and survey borings, channel material and geometry, and extra cross-sections <br /> at the request of the City. Locations of cross-sections will require pre-staking by the <br /> City or City's Engineer prior to survey. <br /> Schedule <br /> The following project milestones are estimated and may require modification pending preliminary <br /> engineering results and construction timeframe constraints: <br /> • 60% Design Documents Submittal (90 days) <br /> • 90% Design Documents Submittal (45 days) <br /> • 99% Design Documents Submittal (14 days) <br /> • 100% Design Documents Submittal (7 days) <br /> The estimated timeframes identified do not include time for City review of submittals. <br /> City Responsibilities <br /> 1. The City will provide to KIMLEY-HORN all data in the City's possession relating to KIMLEY- <br /> HORN's services on the Project. KIMLEY-HORN will reasonably rely upon the accuracy, <br /> timeliness, and completeness of the information provided by the City. <br /> 2. The City will give prompt notice to KIMLEY-HORN whenever the City observes or becomes <br /> aware of any development that affects the scope or timing of KIMLEY-HORN's services. <br /> 3. The City will examine information submitted by KIMLEY-HORN and render in writing or otherwise <br /> provide comments and decisions in a timely manner. <br /> 8 <br />