My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2017-139/Whisper finance agreement
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2017
>
Res 2017-139/Whisper finance agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2017 9:23:13 AM
Creation date
9/12/2017 1:32:55 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2017-139
Date
9/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Road C & Associated Utilities <br />o Road C (Susurro Parkway) improvements will consist of construction of a <br />divided arterial road beginning at the northbound frontage road of IH 35 <br />service road for 2,000 feet and transiting to a collector road that ends at <br />existing Harris Hill road (CR 160) approximately 1,541 feet for a total Road C <br />distance of 3,541 feet. These improvements will provide road and <br />thoroughfare access to phases of the Project north and south of Road C and <br />consist of the construction of related earthwork, drianage, paving, sidewalks, <br />signage, traffic control devices, manholes, water/waste water trunk mains, <br />pipes, valves and associated appurtenances. All roadway improvements will <br />be constructed according to City standards. The Actual Costs of these Public <br />Improvements are $2,332,692. Actual Costs expended as of July 12, 2017 are <br />Offsite Waste Water Line B <br />o A proposed 8 inch wastewater line begins at an existing manhole located <br />near the northwest corner of the San Marcos Technology Park subdivision <br />approximately 1,500 south of the Susurro Parkway and IH 35 Frontage Road <br />intersection. The 8 inch wastewater line extends northeast a distance of <br />1,900 feet and end at Susurro Parkway (Revised to Wastewater Line C in PID <br />Construction plans station 1+00 to 19+00). These improvments will provide <br />service to phases of the Project south of Road C (Susurro Parkway). All utility <br />improvements will be constructed according to City standards. The Actual <br />Costs for these Public Improvements are $271,752. <br />Description Total (a) <br />Road A & Associated Utilities <br />Road B & Associated Utilities <br />Lift Station & Waste Water Line D <br />Road C & Associated Utilities <br />Offsite Waste Water Line B <br />$ 5,323,410 <br />2,225,247 <br />245,929 <br />2,332,692 <br />271.752 <br />Total Public Improvements $ 10,399,030 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.