My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2017-139/Whisper finance agreement
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2017
>
Res 2017-139/Whisper finance agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2017 9:23:13 AM
Creation date
9/12/2017 1:32:55 PM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2017-139
Date
9/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT "D" <br />PUBLIC IMPROVEMENTS <br />The Public Improvements are described below. The current costs for the Public <br />Improvements are $10,399,030 as shown in Table III and which may be revised during <br />Annual Service Plan Updates. <br />• Road A& Associated Utilities <br />o Road A (Whisper Hills Boulevard) improvements will consist of construction <br />of a divided arterial road beginning at the northbound frontage road of IH 35 <br />service road for approximately 4,324 feet and transiting to a collector road <br />that ends at existing Harris Hill Road (CR 160) approximately 2,675 feet for a <br />total Road A distance of approximately 6,999 feet. These improvements will <br />provide road and thoroughfare access to phases of the Project north and <br />south of Road A and consist of the construction of related earthwork, <br />drainage, paving, sidewalks, signage, traffic control devices, manholes, <br />water/waste water trunk mains, pipes, valves and associated appurtenances. <br />All roadway improvements will be constructed according to City standards. <br />The Actual Costs for these Public Improvements are $5,323,410. <br />• Road B & Associated Utilities <br />o Road B (Rustle Ridge Road) improvements will consist of construction of a <br />collector road beginning at road A (Whisper Hills Boulevard and extending <br />north for 2,859 feet to existing Yarrington Road (CR159). These <br />improvements will provide road and thoroughfare access to phases of the <br />Project east and west of Road B and consist of the construction of related <br />earthwork, drainage, paving, sidewalks, signage, traffic control devices, <br />manholes, water/waste water trunk mains, pipes, valves and associated <br />appurtenances. All roadway improvements will be constructed according to <br />City standards. <br />• Lift Station & Waste Water Line D <br />o A proposed 8 inch wastewater line extends north and south of Road A <br />(Whisper Hills Boulevard) at Harris Hill Road. These improvements will <br />provide service to phases of the Project north and south of Road A (Whisper <br />Hills Boulevard) near Harris Hill Road. All utility improvements will be <br />constructed according to City standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.