My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08.15.2017 Regular Meeting
San-Marcos
>
City Clerk
>
01 City Council Minutes
>
2010's
>
2017
>
08.15.2017 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2017 10:18:01 AM
Creation date
10/13/2017 9:21:41 AM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council Meeting Minutes August 15,2017 <br /> Project#656—Spray Pads East side/West Side(FY 2019) be replaced with <br /> Project#221 —Swimming Pool Complex East Side as identified in 2016/17 CIP. <br /> Council directed Staff to keep the initial timelines and not move these to <br /> earlier dates due to the need for more urgent drainage projects. <br /> Next Mrs. Hurlbert addressed the Drainage Rate Modeling and the budget <br /> implications of moving forward. An engineer would have to be added to staff <br /> to support the increased workload. The funding for this position would come <br /> from the drainage fund as opposed to the General Fund. Council directed them <br /> to move forward with adding an additional engineer. <br /> A rate adjustment of 15% over the next 5 years was proposed,which allows a <br /> slower steady increase that is consistent with the philosophy in other utility <br /> funds. Council directed Staff to move forward with this recommendation. <br /> The following recommendation were made regarding Electric Utility: <br /> •Rate adjustment not needed for FY2018, possible need for increase in three to <br /> five years. <br /> •Achieved operating reserve level recommended by Standard & Poors of 60 <br /> days operating expense <br /> including Cost of Power in FY16 <br /> •Temporary increase of franchise fees from 7% to 8% <br /> •Additional recurring and one-time operational expenses-$753,800 <br /> •Capital Outlay Funding-$419,000 <br /> Council approved the recommendations outlinlined in Exhibit C (attached) <br /> regarding Electric Utility. <br /> The following recommendations were made regarding Water/Wastewater: <br /> •5%water rate adjustment(continue small and study) to fund capital projects <br /> .2%wastewater rate adjustment <br /> •Temporary increase of franchise fees from 7 to 8% <br /> •Additional recurring and one time operational expenses-$376,000 <br /> •Capital Outlay funding-$310,000 <br /> Water and wastewater separated on comparison chart—Heather will get this to <br /> council <br /> Council approved the recommendations outlinlined in Exhibit D (attached) <br /> City of San Marcos Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.