Laserfiche WebLink
EXHIBIT 1 <br />CITY OF SAN MARCOS <br />BLANCO GARDENS CDBG-DR DRAINAGE IMPROVEMENT PROJECT <br />PRELIMINARY ENGINEERING - SCOPE OF SERVICES <br />Project Understanding <br />The work to be performed by Scheibe Consulting, LLC. (Scheibe or the Consultant) under this contract will <br />consist of providing Preliminary Engineering (30% Design) Services for the Blanco Gardens Drainage <br />Improvement Project. The project consists of the following proposed improvements: <br />• New Storm Drain System — the installation of up to approximately 7,200 linear feet of 24- to 60 -inch <br />sanitary sewer line within Barbara Drive, Conway Drive, Bliss Lane, and River Road and a new <br />outfall to the San Marcos River. The proposed system will relieve the existing, undersized storm <br />drain system to achieve the City's 25 -year level of service criteria. Replacement of portions of the <br />existing storm drain system will also be evaluated to meet the project objectives. <br />• River Road Reconstruction & Storm Drain — the regrading of River Road from Linda Drive to Cape <br />Road to allow drainage across the road towards the existing drainage easement within the Wood <br />Apartments west of River Road. Storm drain inlets along the east side of River Road and 18- to <br />24 -inch storm drain pipes are also proposed to improve drainage to the existing easement. <br />The feasibility of the following optional improvements identified in the CDBG-DR Infrastructure Feasibility <br />Study will also be evaluated as part of the Preliminary Engineering Services: <br />• 911 Conway Drive Improvements — the addition of storm drain improvements within the potential <br />buy-out lot at 911 Conway Drive in order to improve drainage from the existing drainage easement <br />between Barbara Drive and Conway Drive to the proposed storm drain system within Conway <br />Drive. Potential storm drain inlet and lateral configurations will be evaluated in this area. <br />• Detention — the installation of a potential detention facility between Sturgeon Drive and River Road <br />within the 4.8 -acre undeveloped area at 735 & 745 River Road. <br />• LID — the installation of potential rain gardens, vegetated swales, filter strips and/or other BMPs <br />within existing drainage easements and potential buy-out lots in the project area. <br />• Additional Road/Curb Line Reconstruction —the regrading and/or lowering of select areas in order <br />to improve conveyance from lots and ROW to proposed storm drain inlets. This includes the section <br />of River Road in the vicinity of the City of San Marcos Animal Shelter and River Road Self Storage, <br />as identified in the CDBG-DR Infrastructure Feasibility Study. <br />Basic Scope of Services <br />Preliminary Engineering (30% Design) <br />1. Project Management and QA/QC: This task consists of effort associated with project administration, <br />coordination with City staff, coordination and supervision of the project team, and quality <br />management so that project milestones and deliverables meet schedule and budget constraints. <br />2. Meetings <br />a. Project Coordination Meetings: One (1) utility coordination meeting has been budgeted for <br />the Preliminary Engineering Phase. Scheibe will attend meetings with City of San Marcos <br />Staff to determine project constraints and needs as well as discuss design considerations. <br />