My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2017-176/approving an agreement between the City and AECOM Technical Services, Inc., for the provision of professional services in connection with the Clarewood Drainage Area Improvements Project in an amount not to exceed $344,520.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2017
>
Res 2017-176/approving an agreement between the City and AECOM Technical Services, Inc., for the provision of professional services in connection with the Clarewood Drainage Area Improvements Project in an amount not to exceed $344,520.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2017 1:37:24 PM
Creation date
12/18/2017 10:59:41 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2017-176
Date
12/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV 9.29.17 <br />OTHER DIRECT COSTS <br />I SUMMARY SCOPE I <br />SUBTOTAL <br />I IMUILT <br />TOTAL <br />Z— <br />-----F7op. �A1ty&9.,n:sryS,,--y F <br />FEM <br />UNITS <br />QTY. <br />RATE <br />SUBTOTAL <br />IMUILT <br />TOTAL <br />F"imng <br />L- <br />Wa,k f THC <br />Sm <br />u <br />IUDD <br />1.55'$ <br />1,E75 <br />C.r., <br />F�,l <br />122 <br />$TOO <br />mS <br />I Wo <br />TraweUM4ikaar <br />MMI <br />5;DQ <br />$0.54 <br />u <br />��u $ <br />51 <br />Y' <br />2S4 <br />Total <br />1 <br />$1,964 <br />q1I1Rr.nNTRAC'.T0R RFRVl,rPR FRTIMATF <br />FIRM NAME <br />I SUMMARY SCOPE I <br />SUBTOTAL <br />I IMUILT <br />TOTAL <br />Z— <br />-----F7op. �A1ty&9.,n:sryS,,--y F <br />S23,500 WL <br />L �571 E <br />KAWM <br />w Pent <br />Traffic Cmi and — <br />$7,760.00 <br />a <br />;7,4760 <br />Wa,k f THC <br />$7.463.00 <br />I.CEi <br />$17 35 <br />PF & A <br />F� --tea <br />$13,017 N <br />86 2— <br />Total <br />,;WJS <br />11 TOTAL FEE ESTIMATE <br />C17Y OF SAN MARCOS EXHIBIT NO 3 <br />CLAREWOOD AREA DRAINAGE IMPROVEMENTS PROJECT <br />FINAL IDESIGN <br />-aw,C1—,fx—jj IPRITaCIPAL IPROD MGRISRIENGIIII ENG11I I lEfT I HANG J 1fIECH ADMIN <br />HHng RatIl S 21K 1 $ IS8 Is 2201 $ 1401 $ 921 $ It51 $ I0° I S — <br />LABOR EST11 <br />OTHER DIRECT COSTS <br />ITEM UNITS QTY RATE SUBTCfipL MUILT I TOTAL <br />Phrdmg —s 1 $1500 57� <br />5 1cG iwi$ 1175 <br />=.1 I ml NM 5N4 $�,u 284 <br />T.0 I <br />SUBCCWRACTOR:SERVICES ESTIMATE <br />Page 18 of 19 <br />MEMNON= <br />OTHER DIRECT COSTS <br />ITEM UNITS QTY RATE SUBTCfipL MUILT I TOTAL <br />Phrdmg —s 1 $1500 57� <br />5 1cG iwi$ 1175 <br />=.1 I ml NM 5N4 $�,u 284 <br />T.0 I <br />SUBCCWRACTOR:SERVICES ESTIMATE <br />Page 18 of 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.