Laserfiche WebLink
REV 9.29.17 <br />OTHER DIRECT COSTS <br />I SUMMARY SCOPE I <br />SUBTOTAL <br />I IMUILT <br />TOTAL <br />Z— <br />-----F7op. �A1ty&9.,n:sryS,,--y F <br />FEM <br />UNITS <br />QTY. <br />RATE <br />SUBTOTAL <br />IMUILT <br />TOTAL <br />F"imng <br />L- <br />Wa,k f THC <br />Sm <br />u <br />IUDD <br />1.55'$ <br />1,E75 <br />C.r., <br />F�,l <br />122 <br />$TOO <br />mS <br />I Wo <br />TraweUM4ikaar <br />MMI <br />5;DQ <br />$0.54 <br />u <br />��u $ <br />51 <br />Y' <br />2S4 <br />Total <br />1 <br />$1,964 <br />q1I1Rr.nNTRAC'.T0R RFRVl,rPR FRTIMATF <br />FIRM NAME <br />I SUMMARY SCOPE I <br />SUBTOTAL <br />I IMUILT <br />TOTAL <br />Z— <br />-----F7op. �A1ty&9.,n:sryS,,--y F <br />S23,500 WL <br />L �571 E <br />KAWM <br />w Pent <br />Traffic Cmi and — <br />$7,760.00 <br />a <br />;7,4760 <br />Wa,k f THC <br />$7.463.00 <br />I.CEi <br />$17 35 <br />PF & A <br />F� --tea <br />$13,017 N <br />86 2— <br />Total <br />,;WJS <br />11 TOTAL FEE ESTIMATE <br />C17Y OF SAN MARCOS EXHIBIT NO 3 <br />CLAREWOOD AREA DRAINAGE IMPROVEMENTS PROJECT <br />FINAL IDESIGN <br />-aw,C1—,fx—jj IPRITaCIPAL IPROD MGRISRIENGIIII ENG11I I lEfT I HANG J 1fIECH ADMIN <br />HHng RatIl S 21K 1 $ IS8 Is 2201 $ 1401 $ 921 $ It51 $ I0° I S — <br />LABOR EST11 <br />OTHER DIRECT COSTS <br />ITEM UNITS QTY RATE SUBTCfipL MUILT I TOTAL <br />Phrdmg —s 1 $1500 57� <br />5 1cG iwi$ 1175 <br />=.1 I ml NM 5N4 $�,u 284 <br />T.0 I <br />SUBCCWRACTOR:SERVICES ESTIMATE <br />Page 18 of 19 <br />MEMNON= <br />OTHER DIRECT COSTS <br />ITEM UNITS QTY RATE SUBTCfipL MUILT I TOTAL <br />Phrdmg —s 1 $1500 57� <br />5 1cG iwi$ 1175 <br />=.1 I ml NM 5N4 $�,u 284 <br />T.0 I <br />SUBCCWRACTOR:SERVICES ESTIMATE <br />Page 18 of 19 <br />