My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Res 2017-173/approving a master agreement between the City and Kimley-Horn and Associates, Inc. for the provision of professional engineering services in the estimated amount of $416,949.00
San-Marcos
>
City Clerk
>
03 Resolutions
>
2010's
>
2017
>
Res 2017-173/approving a master agreement between the City and Kimley-Horn and Associates, Inc. for the provision of professional engineering services in the estimated amount of $416,949.00
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2017 1:36:28 PM
Creation date
12/18/2017 11:00:25 AM
Metadata
Fields
Template:
City Clerk
City Clerk - Document
Resolutions
City Clerk - Type
Approving
Number
2017-173
Date
12/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o Technical Specifications <br />o Bid Form <br />• 1 pdf of 99% submittal (same as items listed above) <br />• 2 hard copies (11 x17"), 1 pdf, and CADD files for 100% submittal (same as items listed <br />above) <br />• Monthly status report included with monthly invoice <br />• 1 Set of Final Plans to TDLR for review and Comment <br />3. Bidding Phase Services <br />I. Engineer's Project manager will attend pre-bid meeting with the City. Assist the City in <br />developing meeting agenda <br />II. Receive, record and provide responses to prospective bidder's and suppliers <br />questions. Issue addenda as appropriate to clarify, correct, or change the bidding <br />documents <br />III. Assist the City in opening of bids, review and evaluate all bids including bid amount <br />and prepare recommendation letter for award of the contract for construction <br />IV. Include addenda items in the construction plans and issue "conformed" set of plans <br />for construction <br />4. Construction Phase Services <br />I. Engineer's Project Manager will attend pre -construction meeting with the City <br />II. Engineer will provide responses to Contractor's request for information (RFI) <br />III. Engineer will maintain a log and review contractor change order requests; and provide <br />recommendation to the City <br />IV. Engineer will review and maintain a log of shop drawing submittals <br />V. Attend up to 4 site meetings as requested, including final walk through. <br />VI. Coordinate with TDLR for inspection after construction is completed. <br />5. Record Drawings Phase Services <br />I. Prepare record drawings from contractor as -built information and as per City's <br />standards <br />II. Submit full size set of CAD files of record drawings as per City's requirements <br />Additional Services: <br />Services not specifically identified in the Scope of Services above shall be considered <br />additional and shall be performed on an individual basis upon authorization by the City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.