Laserfiche WebLink
o Develop coordinated signal timing plans for AM, PM, and Off -Peak weekday <br />time periods. <br />o Implement optimized timing plans in the field at the time of signal turn -on. <br />o Observe field operations and fine tune signal timings. <br />• Prepare Illumination Layout sheet will show the locations of proposed light poles, <br />electrical conduits, and ground boxes. The Engineer will coordinate with SMEU before <br />finalizing locations of proposed light poles. <br />• Prepare quantities showing number of light poles, conduits, electrical ground boxes, <br />and pole foundations. <br />• Prepare color coded existing utility layout sheets <br />• Prepare landscaping layout sheets (trees only) <br />• Prepare construction contract timeline <br />• Prepare Item Summaries and update OPCC <br />• Internal quality control reviews of the plan set as well as contract documents <br />• Submit to the City & TxDOT for review and comments <br />III. 90% Plans & Contract Documents <br />• Incorporate City's and TxDOT's comments into 90% plans and specifications <br />• Prepare irrigation plan sheets <br />• Prepare miscellaneous detail sheets <br />• Prepare General Notes <br />• Incorporate TxDOT and City Standard Details <br />• Update quantity summary tables and OPCC broken out by each sheet. <br />• Prepare technical specifications per City of San Marcos and TxDOT standards <br />• Prepare bid form <br />IV. 99% Plans & Contract Documents <br />• Incorporate City's and TxDOT's comments into 99% plans and specifications <br />• Prepare 99% plans and technical specifications ready for bidding <br />V. Final Plans & Contract Documents <br />• Incorporate City's and TxDOT's comments into final plans and specifications <br />• Prepare final plans and technical specifications ready for bidding <br />VI. Deliverables <br />• 4 hard copies (11"x17") and 1 pdf of 60% Submittal <br />o Plan Sheets <br />o List of Standard Details <br />o Construction Contract Timeline <br />o OPCC <br />• 4 hard copies (11 "x17") and 1 pdf of 90% submittal <br />o Plan Sheets including standards <br />o Construction Contract Timeline <br />o General Notes <br />o OPCC <br />