Laserfiche WebLink
Proposed Fee and Design Task Breakdown Schedule <br />ATTACHMENT B - FEE SCHEDULE <br />City of San Marcos, Texas <br />Hopkins Street Multi -Use Bike and Pedestrian Project <br />Printed: 11/7/2017 <br />Kmley-Horn Staff <br />Subconsultants <br />c <br />a°1i <br />w <br />m <br />w <br />Ik > <br />z <br />=ba <br />u <br />c <br />F <br />° > <br />m <br />N <br />? <br />C <br />C <br />Professional Service Description <br />io- <br />w <br />i5 <br />a- <br />c <br />u u <br />x <br />0 <br />Task 1- Preliminary Engineering Phase Services <br />$225.00 <br />$180.00 <br />$150.00 <br />$135.00 <br />$95.00 <br />$80.00 Fee <br />Fee <br />1-I 1 Data Collection <br />Kickoff Meeting with City Staff <br />12 <br />$ <br />2,220 <br />4 <br />4 <br />4 <br />Obtain and Review Available As-Builts, survey, utilities, and traffic data <br />24 <br />$ <br />3,420 <br />12 <br />12 <br />One Site Visit <br />16 <br />$ <br />2,760 <br />4 <br />4 <br />4 <br />4 <br />Traffic Counts <br />$ <br />5,000 <br />1 -II Topographic and ROW Survey <br />Topographic Survey Fee (See CP&Y Fee Schedule) <br />$ <br />25,260 <br />$ 25,260.00 <br />ROW Survey Fee (See CP&Y Fee Schedule) <br />$ <br />10,010 <br />$ 10,010.00 <br />Railroad Permitting for Survey (See CP&Y Fee Schedule) <br />$ <br />1,830 <br />$ 1,830.00 <br />30% Survey Subconsultantmark-up <br />$ <br />3,710 <br />1 -III Prepare Preliminary Engineering Report <br />Develop Multi -Use Path Geometry <br />30 <br />$ <br />4,2001 <br />10 <br />1 20 <br />Thorpe Lane Intersection Sidewalk Drainage Analysis and Calculations <br />56 <br />$ <br />8,160 <br />8 <br />16 <br />32 <br />Prepare Multi -Use Path Exhibits <br />48 <br />$ <br />6,840 <br />4 <br />12 <br />32 <br />Prepare Charles Austin to Thorpe Lane Drainage Exhibit <br />20 <br />$ <br />2,880 <br />2 <br />6 <br />12 <br />Prepare Typical Sections Exhibit <br />12 <br />$ <br />1,680 <br />4 <br />8 <br />Prepare exhibit and OPCC for 6' sidewalk south side of Hopkins <br />44 <br />$ <br />6,480 <br />8 <br />12 <br />24 <br />Prepare (3) exhibits and (3) OPCC for San Marcos pedestrian bridge <br />24 <br />$ <br />3,540 <br />4 <br />8 <br />12 <br />Prepare exhibit and OPCC for Traffic Calming measures at crossing <br />25 <br />$ <br />3,675 <br />5 <br />5 <br />15 <br />Prepare exhibit and OPCC for Monumentation <br />16 <br />$ <br />2,220 <br />4 <br />12 <br />Prepare Tree Planting/Removal Exhibit <br />28 <br />$ <br />4,080 <br />4 <br />8 <br />16 <br />Develop Photometric Model for MU Path North of Hopkins <br />30 <br />$ <br />4,725 <br />10 <br />15 <br />5 <br />Develop Photometric Model for E Hopkins St <br />40 <br />$ <br />6,450 <br />15 <br />25 <br />Prepare Photometric Exhibits <br />28 <br />$ <br />4,290 <br />8 <br />30 <br />10 <br />Illumination for Sidewalk south of Hopkins St (Photometrics + Exhibits) <br />55 <br />$ <br />8,475 <br />20 <br />10 <br />25 <br />Signal Warrant Analysis at 2 Locations <br />85 <br />$ <br />12,600 <br />15 <br />30 <br />40 <br />Develop Synchro Model for E Hopkins St from CM Allen to Thorpe Ln <br />32 <br />$ <br />4,560 <br />2 <br />10 <br />20 <br />Develop coordinated timing plans for the new signal <br />24 <br />$ <br />3,540 <br />4 <br />8 <br />12 <br />Prepare Path, Intersection, signal, and drainage OPCC <br />22 <br />$ <br />3,120 <br />2 <br />4 <br />16 <br />Prepare Utility Conflict Exhibit and spreadsheet <br />16 <br />$ <br />2,220 <br />4 <br />12 <br />Prepare Preliminary Engineering Report <br />52 <br />$ <br />7,300 <br />4 <br />4 <br />12 <br />24 <br />1 <br />g <br />Quality Review <br />12 <br />$ <br />2,430 <br />6 <br />6 <br />Charles Austin Improvements: <br />Develop Charles Austin Intersection Geometry <br />15 <br />$ <br />2,100 <br />5 <br />10 <br />Prepare Charles Austin Intersection Exhibit <br />17 <br />$ <br />2,460 <br />2 <br />5 <br />30 <br />Analyze Lane Useage & Phasing at Charles Austin <br />25 <br />$ <br />3,750 <br />5 <br />10 <br />10 <br />