Laserfiche WebLink
Proposed Fee and Design Task Breakdown Schedule <br />Printed: 11/7/2017 <br />ATTACHMENT B - FEE SCHEDULE <br />City of San Marcos, Texas <br />Hopkins Street Multi -Use Bike <br />and Pedestrian Project <br />Kimley-Horn Staff <br />Subconsultants <br />« <br />u <br />= <br />u <br />m <br />m <br />c <br />'m <br />a0 <br />V <br />C <br />w <br />~ <br />04 <br />> <br />z <br />F21 <br />Y <br />~ <br />Y <br />W <br />O <br />W <br />p <br />y <br />O <br />N <br />C <br />Q <br />E <br />io <br />v <br />0 <br />'N <br />m <br />Professional Service Description�° <br />Io <br />iu <br />u, <br />a <br />°' <br />c <br />W <br />u <br />& <br />x <br />$225.00 <br />$180.00 <br />$150.00 <br />$135.00 <br />$95.00 <br />$80.00 <br />Fee <br />u° <br />Fee <br />1 -IV Environmental and Public Involvment Services <br />Subconsultant Environmental Fee (see CMEC Fee Schedule) <br />$ <br />21,289 <br />$ 21,289.00 <br />30% Environmental Subconsultant Mark-up <br />$ <br />2,100 <br />Prepare Public Meeting Exhibits and Handouts <br />37 <br />$ <br />5,565 <br />5 <br />8 <br />24 <br />Attend Public Meeting <br />15 <br />$ <br />2,775 <br />S <br />5 <br />5 <br />Respond to Public Meeting Comments <br />16 <br />$ <br />2,760 <br />4 <br />4 <br />4 <br />4 <br />Total Task 1: 876 <br />$ <br />200,474.00 <br />32 <br />145 <br />270 <br />421 <br />0 <br />8 <br />Task 2 - Design Phase Services <br />2-1 Project Management and Administration <br />$ <br />- <br />Attend up to 5 Progress/Comment resolution Meetings <br />52 <br />$ <br />9,660 <br />20 <br />12 <br />20 <br />Project Adminstration and Coordination <br />32 <br />$ <br />4,560 <br />8 <br />12 <br />12 <br />Prepare Monthly Invoice <br />24 <br />$ <br />2,500 <br />4 <br />20 <br />Prepare Monthly Status Report <br />30 <br />$ <br />1,500 <br />10 <br />2 -II 60% Plans and Contract Documents <br />Respond to and Incorporate City Preliminary Review Comments <br />22 <br />$ <br />3,270 <br />4 <br />8 <br />10 <br />Prepare Multi -Use Path Plan and Profile Sheets (9) <br />88 <br />$ <br />12,540 <br />8 <br />20 <br />60 <br />Prepare Drainage Plan and Calculations Sheets for Charles Austin to Thorpe <br />40 <br />$ <br />5,760 <br />4 <br />12 <br />24 <br />Prepare Thorpe Lane Intersection Drainage Plan and Calculations Sheets (2) <br />32 <br />$ <br />4,560 <br />2 <br />10 <br />20 <br />Prepare South Sidewalk Reconstruction Sheets (if necessary) <br />72 <br />$ <br />10,200 <br />4 <br />20 <br />48 <br />Prepare Cover Sheet <br />7 <br />$ <br />960 <br />1 <br />6 <br />Prepare Index <br />5 <br />$ <br />690 <br />1 <br />4 <br />Prepare Quantity Summary Tables <br />26 <br />$ <br />3,720 <br />2 <br />8 <br />16 <br />Prepare Typical Section Sheets <br />6 <br />$ <br />840 <br />2 <br />4 <br />Prepare Traffic Control and Construction Phasing Plans <br />60 <br />$ <br />8,520 <br />4 <br />16 <br />40 <br />Prepare Signing and Pavement Marking Sheets (5) <br />20 <br />$ <br />2,820 <br />8 <br />12 <br />Prepare Erosion Control/SWPPP/EPIC Sheets (7) <br />42 <br />$ <br />5,820 <br />10 <br />32 <br />Prepare Preliminary Cross Sections <br />32 <br />$ <br />4,440 <br />8 <br />24 <br />Signal Existing Conditions <br />15 <br />$ <br />2,100 <br />5 <br />10 <br />Proposed Signal Layout Sheets (2) <br />90 <br />$ <br />12,900 <br />10 <br />20 <br />60 <br />Signal Elevation Sheets <br />18 <br />$ <br />2,610 <br />2 <br />6 <br />10 <br />Electrical Wiring Sheets (2) <br />25 <br />$ <br />3,585 <br />2 <br />8 <br />15 <br />Phasing & Detection Sheets (2) <br />18 <br />$ <br />2,610 <br />2 <br />6 <br />10 <br />Load Switch Assignment Sheet (2) <br />18 <br />$ <br />2,610 <br />2 <br />6 <br />10 <br />Signal Quantities Sheet (2) <br />9 <br />$ <br />1,275 <br />4 <br />5 <br />Prepare Utility Layout Sheets <br />16 <br />$ <br />2,220 <br />4 <br />12 <br />Prepare Landscaping/Tree Mitigation Sheets <br />36 <br />$ <br />5,300 <br />2 <br />10 <br />24 <br />Prepare Construction Contract Timeline <br />8 <br />$ <br />1,260 <br />2 <br />6 <br />Update OPCC <br />10 <br />$ <br />1,440 <br />1 <br />3 <br />6 <br />Quality Review <br />20 <br />$ <br />4,050 <br />10 <br />10 <br />